Q2981132 (Q2981132): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid., trans...)
Property / summary
 
The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English)
Property / summary: The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English) / rank
 
Normal rank
Property / summary: The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:13, 9 July 2021

Project Q2981132 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2981132 in Portugal

    Statements

    0 references
    30,000,000.0 Euro
    0 references
    85.0 percent
    0 references
    1 August 2016
    0 references
    31 December 2020
    0 references
    REN - REDE ELÉCTRICA NACIONAL, S.A.
    0 references
    0 references

    41°41'32.53"N, 8°50'18.13"W
    0 references
    A Operação consiste na construção de um cabo submarino e um posto de corte que permitirá a ligação à rede da Zona Piloto de Viana de Castelo, onde serão instalados projetos de produção de energia renovável offshore. A Zona Piloto irá localizar-se no mar a cerca de 17km de distância da costa e não possui, até à data, de qualquer ligação que permita introduzir a energia produzida na Zona Piloto na rede elétrica nacional. (Portuguese)
    0 references
    The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English)
    9 July 2021
    0 references
    Viana do Castelo, União das freguesias de Viana do Castelo (Santa Maria Maior e Monserrate) e Meadela
    0 references

    Identifiers

    POSEUR-01-1001-FC-000020
    0 references