Q2981132 (Q2981132): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid., trans...) |
||||||||||||||
Property / summary | |||||||||||||||
The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English) | |||||||||||||||
Property / summary: The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:13, 9 July 2021
Project Q2981132 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2981132 in Portugal |
Statements
30,000,000.0 Euro
0 references
85.0 percent
0 references
1 August 2016
0 references
31 December 2020
0 references
REN - REDE ELÉCTRICA NACIONAL, S.A.
0 references
A Operação consiste na construção de um cabo submarino e um posto de corte que permitirá a ligação à rede da Zona Piloto de Viana de Castelo, onde serão instalados projetos de produção de energia renovável offshore. A Zona Piloto irá localizar-se no mar a cerca de 17km de distância da costa e não possui, até à data, de qualquer ligação que permita introduzir a energia produzida na Zona Piloto na rede elétrica nacional. (Portuguese)
0 references
The operation consists of the construction of a submarine cable and a cutoff point that will allow the connection to the network of the Viana de Castelo Pilot Zone, where offshore renewable energy production projects will be installed. The Pilot Zone will be located at sea about 17 km away from the coast and does not have, to date, any connection to allow the energy produced in the Pilot Zone to be introduced into the national power grid. (English)
9 July 2021
0 references
Viana do Castelo, União das freguesias de Viana do Castelo (Santa Maria Maior e Monserrate) e Meadela
0 references
Identifiers
POSEUR-01-1001-FC-000020
0 references