Q2981129 (Q2981129): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
(‎Created claim: summary (P836): It is the construction of a Biomass Plant for energy production. 10 direct jobs and some 30 indirect jobs will be created. From an environmental point of view it will have a very relevant impact:6121.50 ton/CO2 greenhouse gases are avoided annually and avoid landfill of 35,000 tons of residual biomass about 1725 tonnes/year of ash for enrichment of forest soils in nutrients, translated_summary)
Property / summary
 
It is the construction of a Biomass Plant for energy production. 10 direct jobs and some 30 indirect jobs will be created. From an environmental point of view it will have a very relevant impact:6121.50 ton/CO2 greenhouse gases are avoided annually and avoid landfill of 35,000 tons of residual biomass about 1725 tonnes/year of ash for enrichment of forest soils in nutrients (English)
Property / summary: It is the construction of a Biomass Plant for energy production. 10 direct jobs and some 30 indirect jobs will be created. From an environmental point of view it will have a very relevant impact:6121.50 ton/CO2 greenhouse gases are avoided annually and avoid landfill of 35,000 tons of residual biomass about 1725 tonnes/year of ash for enrichment of forest soils in nutrients (English) / rank
 
Normal rank
Property / summary: It is the construction of a Biomass Plant for energy production. 10 direct jobs and some 30 indirect jobs will be created. From an environmental point of view it will have a very relevant impact:6121.50 ton/CO2 greenhouse gases are avoided annually and avoid landfill of 35,000 tons of residual biomass about 1725 tonnes/year of ash for enrichment of forest soils in nutrients (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:13, 9 July 2021

Project Q2981129 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2981129 in Portugal

    Statements

    0 references
    4,620,000.0 Euro
    0 references
    85.0 percent
    0 references
    1 July 2021
    0 references
    30 June 2023
    0 references
    TERMOBROWN, LDA
    0 references
    0 references

    38°38'45.35"N, 9°5'23.46"W
    0 references
    Trata-se da construção de uma Central de Biomassa para produção de energia. Serão criados 10 postos de trabalho diretos e cerca de 30 indiretos. Do ponto de vista ambiental terá um impacto muito relevante:•6121,50 ton/CO2 equiv. de gases com efeito estufa são evitados anualmente•evita a deposição em aterro de 35.000 ton de biomassa residual•cerca de 1725 toneladas/ano de cinzas para enriquecimento dos solos florestais em nutrientes (Portuguese)
    0 references
    It is the construction of a Biomass Plant for energy production. 10 direct jobs and some 30 indirect jobs will be created. From an environmental point of view it will have a very relevant impact:6121.50 ton/CO2 greenhouse gases are avoided annually and avoid landfill of 35,000 tons of residual biomass about 1725 tonnes/year of ash for enrichment of forest soils in nutrients (English)
    9 July 2021
    0 references
    Seixal, União das freguesias do Seixal, Arrentela e Aldeia de Paio Pires
    0 references

    Identifiers

    POSEUR-01-1001-FC-000015
    0 references