Q2981780 (Q2981780): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets., translated_summary)
Property / summary
 
The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets. (English)
Property / summary: The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets. (English) / rank
 
Normal rank
Property / summary: The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets. (English) / qualifier
 
point in time: 9 July 2021
Timestamp+2021-07-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:03, 9 July 2021

Project Q2981780 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2981780 in Portugal

    Statements

    0 references
    6,767,060.86 Euro
    0 references
    85.0 percent
    0 references
    21 February 2019
    0 references
    31 March 2021
    0 references
    INSTITUTO DA CONSERVAÇÃO DA NATUREZA E DAS FLORESTAS, I.P.
    0 references
    0 references
    As medidas especificas para a execução da RPFGC, são: a)Instalação e beneficiação FIC b)Instalação e beneficiação RVF c)Instalação e beneficiação FGC, assentes em FIC Com estas medidas pretende-se garantir o ordenamento espacial de áreas geridas que ofereça resistência à progressão do fogo e reforce a eficiência da rede primária, protegendo aglomerados populacionais, pessoas e bens. (Portuguese)
    0 references
    The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets. (English)
    9 July 2021
    0 references

    Identifiers

    POSEUR-02-1810-FC-000519
    0 references