Q2981780 (Q2981780): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Created claim: summary (P836): The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets. (English) | |||||||||||||||
Property / summary: The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets. (English) / qualifier | |||||||||||||||
point in time: 9 July 2021
|
Revision as of 01:03, 9 July 2021
Project Q2981780 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2981780 in Portugal |
Statements
6,767,060.86 Euro
0 references
85.0 percent
0 references
21 February 2019
0 references
31 March 2021
0 references
INSTITUTO DA CONSERVAÇÃO DA NATUREZA E DAS FLORESTAS, I.P.
0 references
As medidas especificas para a execução da RPFGC, são: a)Instalação e beneficiação FIC b)Instalação e beneficiação RVF c)Instalação e beneficiação FGC, assentes em FIC Com estas medidas pretende-se garantir o ordenamento espacial de áreas geridas que ofereça resistência à progressão do fogo e reforce a eficiência da rede primária, protegendo aglomerados populacionais, pessoas e bens. (Portuguese)
0 references
The specific measures for the implementation of the RPFGC are: A) Installation and upgrading FIC b) Installation and upgrading RVF c) Installation and upgrading FGC, based on FIC With these measures, the aim is to ensure spatial planning of managed areas that offer resistance to the progression of the fire and strengthen the efficiency of the primary network, protecting population clusters, people and assets. (English)
9 July 2021
0 references
Identifiers
POSEUR-02-1810-FC-000519
0 references