Q2981132 (Q2981132): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Alto Minho Subregion / rank
 
Normal rank

Revision as of 21:35, 8 July 2021

Project Q2981132 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2981132 in Portugal

    Statements

    0 references
    30,000,000.0 Euro
    0 references
    85.0 percent
    0 references
    1 August 2016
    0 references
    31 December 2020
    0 references
    REN - REDE ELÉCTRICA NACIONAL, S.A.
    0 references
    0 references

    41°41'32.53"N, 8°50'18.13"W
    0 references
    A Operação consiste na construção de um cabo submarino e um posto de corte que permitirá a ligação à rede da Zona Piloto de Viana de Castelo, onde serão instalados projetos de produção de energia renovável offshore. A Zona Piloto irá localizar-se no mar a cerca de 17km de distância da costa e não possui, até à data, de qualquer ligação que permita introduzir a energia produzida na Zona Piloto na rede elétrica nacional. (Portuguese)
    0 references
    Viana do Castelo, União das freguesias de Viana do Castelo (Santa Maria Maior e Monserrate) e Meadela
    0 references

    Identifiers

    POSEUR-01-1001-FC-000020
    0 references