Q2913355 (Q2913355): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks., translated_summary)
Property / summary
 
This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks. (English)
Property / summary: This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks. (English) / rank
 
Normal rank
Property / summary: This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:06, 8 July 2021

Project Q2913355 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2913355 in Portugal

    Statements

    0 references
    1,419,886.02 Euro
    0 references
    85.0 percent
    0 references
    1 September 2017
    0 references
    31 December 2021
    0 references
    APA - ADMINISTRAÇÃO DO PORTO DE AVEIRO, S.A.
    0 references
    0 references
    0 references

    40°38'15.40"N, 8°42'49.18"W
    0 references
    Esta operação consiste na execução da empreitada de implementação da operacionalidade das pontes cais n.º 24, n.º, 25 e n.º 26 do TGL do Porto de Aveiro. Os principais trabalhos a executar são o prolongamento da esteira existente até às referidas pontes cais e construção das redes de drenagem de águas pluviais e contaminadas e de combate a incêndios. (Portuguese)
    0 references
    This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks. (English)
    8 July 2021
    0 references
    Ílhavo, Gafanha da Nazaré
    0 references

    Identifiers

    POCI-04-2655-FC-000001
    0 references