PLANOS INTEGRADOS E INOVADORES DE COMBATE AO INSUCESSO ESCOLAR - PROJETOS (Q2899055): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): Municipality decided to focus on the development of a systemic and holistic intervention approach of the student and the problem of failure and school dropout. An integrated plan to combat failure was devised that integrates the structuring of a multidisciplinary team and promotes the development of new methodologies and pedagogical contents, as well as the construction of a monitoring tool for the entire school environment., translated_summary)
Property / summary
 
Municipality decided to focus on the development of a systemic and holistic intervention approach of the student and the problem of failure and school dropout. An integrated plan to combat failure was devised that integrates the structuring of a multidisciplinary team and promotes the development of new methodologies and pedagogical contents, as well as the construction of a monitoring tool for the entire school environment. (English)
Property / summary: Municipality decided to focus on the development of a systemic and holistic intervention approach of the student and the problem of failure and school dropout. An integrated plan to combat failure was devised that integrates the structuring of a multidisciplinary team and promotes the development of new methodologies and pedagogical contents, as well as the construction of a monitoring tool for the entire school environment. (English) / rank
 
Normal rank
Property / summary: Municipality decided to focus on the development of a systemic and holistic intervention approach of the student and the problem of failure and school dropout. An integrated plan to combat failure was devised that integrates the structuring of a multidisciplinary team and promotes the development of new methodologies and pedagogical contents, as well as the construction of a monitoring tool for the entire school environment. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 07:55, 8 July 2021

Project Q2899055 in Portugal
Language Label Description Also known as
English
PLANOS INTEGRADOS E INOVADORES DE COMBATE AO INSUCESSO ESCOLAR - PROJETOS
Project Q2899055 in Portugal

    Statements

    0 references
    250,389.91 Euro
    0 references
    85.0 percent
    0 references
    1 September 2018
    0 references
    31 July 2020
    0 references
    MUNICÍPIO DE ARMAMAR
    0 references
    0 references
    0 references

    41°6'16.92"N, 7°41'11.94"W
    0 references
    Município decidiu apostar no desenvolvimento de uma abordagem de intervenção sistémica e holística do aluno e da problemática do insucesso e abandono escolar.Foi assim delineado um plano integrado de combate ao insucesso que integra a estruturação de uma equipa multidisciplinar e promove o desenvolvimento de novas metodologias e conteúdos pedagógicos,bem como a construção de uma ferramenta de monitorização de todo o meio escolar. (Portuguese)
    0 references
    Municipality decided to focus on the development of a systemic and holistic intervention approach of the student and the problem of failure and school dropout. An integrated plan to combat failure was devised that integrates the structuring of a multidisciplinary team and promotes the development of new methodologies and pedagogical contents, as well as the construction of a monitoring tool for the entire school environment. (English)
    8 July 2021
    0 references
    Armamar, Armamar
    0 references

    Identifiers

    NORTE-08-5266-FSE-000172
    0 references