(‎Created claim: summary (P836): The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users., translated_su...)
Property / summary
 
The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users. (English)
Property / summary: The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users. (English) / rank
 
Normal rank
Property / summary: The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 07:48, 8 July 2021

Project Q2898345 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2898345 in Portugal

    Statements

    0 references
    318,607.2 Euro
    0 references
    83.0 percent
    0 references
    7 January 2019
    0 references
    31 December 2021
    0 references
    CENTRO SOCIAL PAROQUIAL DE S.MIGUEL DE LOBRIGOS
    0 references
    0 references

    41°11'45.49"N, 7°47'15.68"W
    0 references
    O projeto pretende requalificar todo o edifício e simultaneamente ampliar, com a integração e adaptação das antigas instalações da Creche e do CATL, no Nível 1, para ampliação da ERPI e aumento da capacidade do SADEste vai permitir o alargamento da capacidade para 43 residentes (alojados em 22 quartos, sendo 4 triplos, 13 duplos e 5 individuais), SAD para 80 utentes, mantendo-se, contudo, inalterada a capacidade do Centro de Dia em 20 utentes. (Portuguese)
    0 references
    The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users. (English)
    8 July 2021
    0 references
    Santa Marta de Penaguião, União das freguesias de Lobrigos (São Miguel e São João Baptista) e Sanhoane
    0 references

    Identifiers

    NORTE-07-4842-FEDER-000338
    0 references