Q2897588 (Q2897588): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): This operation consists of 8 actions, to be implemented in the period of time execution from January 2020 to December 2021. The project presented here aims to ensure, in a logic of integration, proximity and roaming, the response to certain needs of the target group concerned. In this sense, actions that actively contribute to the elimination of discrimination, economic, cultural and territorial are listed., translated_summary)
Property / summary
 
This operation consists of 8 actions, to be implemented in the period of time execution from January 2020 to December 2021. The project presented here aims to ensure, in a logic of integration, proximity and roaming, the response to certain needs of the target group concerned. In this sense, actions that actively contribute to the elimination of discrimination, economic, cultural and territorial are listed. (English)
Property / summary: This operation consists of 8 actions, to be implemented in the period of time execution from January 2020 to December 2021. The project presented here aims to ensure, in a logic of integration, proximity and roaming, the response to certain needs of the target group concerned. In this sense, actions that actively contribute to the elimination of discrimination, economic, cultural and territorial are listed. (English) / rank
 
Normal rank
Property / summary: This operation consists of 8 actions, to be implemented in the period of time execution from January 2020 to December 2021. The project presented here aims to ensure, in a logic of integration, proximity and roaming, the response to certain needs of the target group concerned. In this sense, actions that actively contribute to the elimination of discrimination, economic, cultural and territorial are listed. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 07:30, 8 July 2021

Project Q2897588 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2897588 in Portugal

    Statements

    0 references
    116,087.56 Euro
    0 references
    83.0 percent
    0 references
    8 January 2020
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE RIBEIRA DE PENA
    0 references
    0 references
    0 references

    41°31'10.74"N, 7°47'37.28"W
    0 references
    A presente operação, é composta por 8 ações, a concretizar no período de execução temporal de Janeiro de 2020 a Dezembro de 2021. Com o projeto aqui apresentado pretende-se assegurar, numa lógica de Integração, proximidade e itinerância, a resposta a determinadas necessidades do grupo-alvo abrangido. Neste sentido, são elencadas as ações que concorrem ativamente para a eliminação de discriminações, económicas, culturais e territoriais. (Portuguese)
    0 references
    This operation consists of 8 actions, to be implemented in the period of time execution from January 2020 to December 2021. The project presented here aims to ensure, in a logic of integration, proximity and roaming, the response to certain needs of the target group concerned. In this sense, actions that actively contribute to the elimination of discrimination, economic, cultural and territorial are listed. (English)
    8 July 2021
    0 references
    Ribeira de Pena
    0 references

    Identifiers

    NORTE-07-4230-FSE-000024
    0 references