“Requalification of the south and west wings of the Fair – Vairão” (Q2895600): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): The project aims to improve the environmental, aesthetic, pedestrian accessibility and enjoyment conditions of Largo da Feira, as a public green space, as well as to facilitate mobility and car access to the surrounding dwellings. With 1200 m² of area it is intended to redefine the design of the surrounding street, the paving of the areas of motorway and pedestrian traffic, the conduction of rainwater and the delimitation of the gardens, remov...)
Property / summary
The project aims to improve the environmental, aesthetic, pedestrian accessibility and enjoyment conditions of Largo da Feira, as a public green space, as well as to facilitate mobility and car access to the surrounding dwellings. With 1200 m² of area it is intended to redefine the design of the surrounding street, the paving of the areas of motorway and pedestrian traffic, the conduction of rainwater and the delimitation of the gardens (English)
 
Property / summary: The project aims to improve the environmental, aesthetic, pedestrian accessibility and enjoyment conditions of Largo da Feira, as a public green space, as well as to facilitate mobility and car access to the surrounding dwellings. With 1200 m² of area it is intended to redefine the design of the surrounding street, the paving of the areas of motorway and pedestrian traffic, the conduction of rainwater and the delimitation of the gardens (English) / rank
Normal rank
 
Property / summary: The project aims to improve the environmental, aesthetic, pedestrian accessibility and enjoyment conditions of Largo da Feira, as a public green space, as well as to facilitate mobility and car access to the surrounding dwellings. With 1200 m² of area it is intended to redefine the design of the surrounding street, the paving of the areas of motorway and pedestrian traffic, the conduction of rainwater and the delimitation of the gardens (English) / qualifier
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 07:20, 8 July 2021

Project Q2895600 in Portugal
Language Label Description Also known as
English
“Requalification of the south and west wings of the Fair – Vairão”
Project Q2895600 in Portugal

    Statements

    0 references
    20,641.91 Euro
    0 references
    85.0 percent
    0 references
    20 January 2017
    0 references
    30 September 2017
    0 references
    FREGUESIA DE FORNELO E VAIRÃO
    0 references
    0 references

    41°19'59.45"N, 8°39'23.94"W
    0 references
    O projeto visa melhorar as condições ambientais, estéticas, de acessibilidade pedonal e de fruição do Largo da Feira, enquanto espaço verde público, assim como facilitar a mobilidade e o acesso automóvel às habitações que o circundam. Com 1200m2 de área pretende-se a redefinição do desenho do arruamento circundante, a pavimentação das áreas de circulação automóvel e pedonal, a condução das águas pluviais e a delimitação dos espaços ajardinados (Portuguese)
    0 references
    Vila do Conde, União das freguesias de Fornelo e Vairão
    0 references

    Identifiers

    NORTE-05-2316-FEDER-000025
    0 references