BIKE PATH BETWEEN THE URBAN AGGLOMERATES OF MOIMENTA ON THE BORDER AND LEOMIL (Q2894685): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil)., remove_old_english_translation)
Property / summary
In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil). (English)
 
Property / summary: In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil). (English) / rank
Normal rank
 
Property / summary: In practice, the intervention consists of the construction of a 3.0 m wide walk/cycle path, with the dual function of serving cyclists and pedestrians, and a green strip of protection of 1.5 m wide, along EN226, (among the urban agglomerates of Moimenta da Beira and Leomil). (English) / qualifier
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 07:08, 8 July 2021

Project Q2894685 in Portugal
Language Label Description Also known as
English
BIKE PATH BETWEEN THE URBAN AGGLOMERATES OF MOIMENTA ON THE BORDER AND LEOMIL
Project Q2894685 in Portugal

    Statements

    0 references
    287,443.56 Euro
    0 references
    85.0 percent
    0 references
    1 January 2019
    0 references
    30 June 2020
    0 references
    MUNICÍPIO DE MOIMENTA DA BEIRA
    0 references

    40°57'20.09"N, 7°39'22.25"W
    0 references
    Na prática, a intervenção consiste na construção de um passeio/ciclovia com 3,0m de largura, com a dupla função de servir ciclistas e peões, e de uma faixa verde de proteção de 1,5m de largura, ao longo da EN226, (entre os aglomerados urbanos de Moimenta da Beira e de Leomil). (Portuguese)
    0 references
    Moimenta da Beira, Leomil
    0 references

    Identifiers

    NORTE-03-1406-FEDER-000050
    0 references