Q2895580 (Q2895580): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Created claim: summary (P836): The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops., translated...) |
||||||||||||||
Property / summary | |||||||||||||||
The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops. (English) | |||||||||||||||
Property / summary: The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 07:05, 8 July 2021
Project Q2895580 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2895580 in Portugal |
Statements
31,212.13 Euro
0 references
85.0 percent
0 references
1 February 2021
0 references
30 September 2021
0 references
MUNICÍPIO DE GONDOMAR
0 references
A Operação Interface da Lourinha Rio Tinto consiste na construção de passeios pedonais/cicláveis amplos, que serão o modo de circulação principal da interface na entrada e largada de pessoas nos seus percursos de chegada e partida, possibilitando um fluxo pedonal mais planeado, ordenado e seguro, permitindo o transbordo e espera entre o fluxo de transportes públicos na envolvente, nomeadamente estação de comboios e paragens de autocarros. (Portuguese)
0 references
The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops. (English)
8 July 2021
0 references
Gondomar, Rio Tinto
0 references
Identifiers
NORTE-05-1406-FEDER-000310
0 references