Q2895579 (Q2895579): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Created claim: summary (P836): This operation aims to restructure the municipal market building. Construction will be carried out in the current building of the market, transforming it on the two lower floors in a multimodal transport station and on the last floor the municipal market remains. This will create excellent conditions for promoting the use of public transport and bicycles., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
This operation aims to restructure the municipal market building. Construction will be carried out in the current building of the market, transforming it on the two lower floors in a multimodal transport station and on the last floor the municipal market remains. This will create excellent conditions for promoting the use of public transport and bicycles. (English) | |||||||||||||||
Property / summary: This operation aims to restructure the municipal market building. Construction will be carried out in the current building of the market, transforming it on the two lower floors in a multimodal transport station and on the last floor the municipal market remains. This will create excellent conditions for promoting the use of public transport and bicycles. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This operation aims to restructure the municipal market building. Construction will be carried out in the current building of the market, transforming it on the two lower floors in a multimodal transport station and on the last floor the municipal market remains. This will create excellent conditions for promoting the use of public transport and bicycles. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 07:05, 8 July 2021
Project Q2895579 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2895579 in Portugal |
Statements
1,971,651.67 Euro
0 references
85.0 percent
0 references
29 May 2020
0 references
28 May 2022
0 references
MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
0 references
Q3000779 (Deleted Item)
0 references
Esta operação pretende a reestruturação do edifício do mercado municipal. Vão realizar-se obras no atual edifício do mercado transformando-o nos dois pisos inferiores numa estação multimodal de transporte e no último piso mantém-se o mercado municipal. Serão assim criadas excelentes condições de promoção da utilização do transporte público e das bicicletas. (Portuguese)
0 references
This operation aims to restructure the municipal market building. Construction will be carried out in the current building of the market, transforming it on the two lower floors in a multimodal transport station and on the last floor the municipal market remains. This will create excellent conditions for promoting the use of public transport and bicycles. (English)
8 July 2021
0 references
Oliveira de Azeméis, União das freguesias de Oliveira de Azeméis, Santiago de Riba-Ul, Ul, Macinhata da Seixa e Madail
0 references
Identifiers
NORTE-05-1406-FEDER-000308
0 references