Q2895568 (Q2895568): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Created claim: summary (P836): The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface. (English) | |||||||||||||||
Property / summary: The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 07:05, 8 July 2021
Project Q2895568 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2895568 in Portugal |
Statements
726,663.68 Euro
0 references
85.0 percent
0 references
30 June 2021
0 references
30 June 2023
0 references
MUNICÍPIO DE MIRANDELA
0 references
Q3000043 (Deleted Item)
0 references
A requalificação do edifício é integrada numa intervenção mais alargada, a realizar na sua envolvente exterior, com o alargamento da plataforma e respectiva cobertura, até à linha férrea ativa, incluindo ainda a construção de um interface de modos suaves (posto de carregamento para bicicletas eléctricas) adjacente ao atual posto de turismo, que também passará a ficar associado à gestão do interface. (Portuguese)
0 references
The upgrading of the building is integrated into a wider intervention, to be carried out in its outer surroundings, with the extension of the platform and its coverage, to the active railway line, including the construction of an interface of smooth modes (charging station for electric bicycles) adjacent to the current tourist office, which will also be associated with the management of the interface. (English)
8 July 2021
0 references
Mirandela
0 references
Identifiers
NORTE-05-1406-FEDER-000288
0 references