Q2895367 (Q2895367): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Created claim: summary (P836): The project consists of the requalification of the Good Success Terminal, as a primary space of public transport interface. It is intended to provide you with the necessary comfort conditions for waiting periods ensuring full accessibility between quays, the shelter of the weather in the necessary conditions and all the information to the public necessary to forward to and to the terminal and to the services existing in it., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of the requalification of the Good Success Terminal, as a primary space of public transport interface. It is intended to provide you with the necessary comfort conditions for waiting periods ensuring full accessibility between quays, the shelter of the weather in the necessary conditions and all the information to the public necessary to forward to and to the terminal and to the services existing in it. (English) | |||||||||||||||
Property / summary: The project consists of the requalification of the Good Success Terminal, as a primary space of public transport interface. It is intended to provide you with the necessary comfort conditions for waiting periods ensuring full accessibility between quays, the shelter of the weather in the necessary conditions and all the information to the public necessary to forward to and to the terminal and to the services existing in it. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of the requalification of the Good Success Terminal, as a primary space of public transport interface. It is intended to provide you with the necessary comfort conditions for waiting periods ensuring full accessibility between quays, the shelter of the weather in the necessary conditions and all the information to the public necessary to forward to and to the terminal and to the services existing in it. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 07:02, 8 July 2021
Project Q2895367 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2895367 in Portugal |
Statements
144,502.47 Euro
0 references
85.0 percent
0 references
2 January 2018
0 references
31 December 2018
0 references
MUNICIPIO DO PORTO
0 references
O projeto consiste na requalificação do Terminal do Bom Sucesso, enquanto espaço primordial de interface de transporte público. Pretende-se dota-lo das necessárias condições de conforto para os períodos de espera garantindo a total acessibilidade entre cais, o abrigo da intempérie nas condições necessárias e toda a informação ao público necessária para encaminhamento de e para o terminal e para os serviços existentes no mesmo. (Portuguese)
0 references
The project consists of the requalification of the Good Success Terminal, as a primary space of public transport interface. It is intended to provide you with the necessary comfort conditions for waiting periods ensuring full accessibility between quays, the shelter of the weather in the necessary conditions and all the information to the public necessary to forward to and to the terminal and to the services existing in it. (English)
8 July 2021
0 references
Porto, União das freguesias de Lordelo do Ouro e Massarelos
0 references
Identifiers
NORTE-05-1406-FEDER-000045
0 references