Q2895360 (Q2895360): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Created claim: summary (P836): The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory. (English) | |||||||||||||||
Property / summary: The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 07:02, 8 July 2021
Project Q2895360 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2895360 in Portugal |
Statements
478,061.11 Euro
0 references
85.0 percent
0 references
16 March 2016
0 references
31 January 2019
0 references
MUNICIPIO DE SANTO TIRSO
0 references
O projeto consiste na construção do troço da Via Panorâmica localizado entre a Avenida Soeiro Mendes da Maia e Rua Dr. Oliveira Salazar, requalificação da Rua Oliveira Salazar e implantação de uma praça junto à Fábrica de Santo Thyrso, para onde confluirá o tráfego automóvel das diferentes direções e que fará a ligação pedonal e ciclável entre as vias intervencionadas e a Fábrica de Santo Thyrso. (Portuguese)
0 references
The project consists of the construction of the section of the Panoramic Way located between Avenida Soeiro Mendes da Maia and Rua Dr. Oliveira Salazar, requalification of Rua Oliveira Salazar and implantation of a square next to the Santo Thyrso Factory, where the car traffic from the different directions will converge and that will make the pedestrian and cyclable link between the intervened roads and the Santo Thyrso Factory. (English)
8 July 2021
0 references
Santo Tirso, União das freguesias de Santo Tirso, Couto (Santa Cristina e São Miguel) e Burgães
0 references
Identifiers
NORTE-05-1406-FEDER-000031
0 references