Q2895172 (Q2895172): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): The operation " Requalification of the public space of Avenida do Santuário and Avenida do Alto do Lume is part of Priority Axis 4 – Environmental Quality, with investment priority 6.5 Adoption of measures to improve the urban environment, revitalise cities, recover and decontaminate abandoned industrial areas, including conversion zones, reduce air pollution and promote noise reduction measures., translated_summary)
Property / summary
 
The operation " Requalification of the public space of Avenida do Santuário and Avenida do Alto do Lume is part of Priority Axis 4 – Environmental Quality, with investment priority 6.5 Adoption of measures to improve the urban environment, revitalise cities, recover and decontaminate abandoned industrial areas, including conversion zones, reduce air pollution and promote noise reduction measures. (English)
Property / summary: The operation " Requalification of the public space of Avenida do Santuário and Avenida do Alto do Lume is part of Priority Axis 4 – Environmental Quality, with investment priority 6.5 Adoption of measures to improve the urban environment, revitalise cities, recover and decontaminate abandoned industrial areas, including conversion zones, reduce air pollution and promote noise reduction measures. (English) / rank
 
Normal rank
Property / summary: The operation " Requalification of the public space of Avenida do Santuário and Avenida do Alto do Lume is part of Priority Axis 4 – Environmental Quality, with investment priority 6.5 Adoption of measures to improve the urban environment, revitalise cities, recover and decontaminate abandoned industrial areas, including conversion zones, reduce air pollution and promote noise reduction measures. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 07:00, 8 July 2021

Project Q2895172 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2895172 in Portugal

    Statements

    0 references
    468,334.49 Euro
    0 references
    85.0 percent
    0 references
    28 May 2018
    0 references
    30 April 2020
    0 references
    MUNICÍPIO DE LOUSADA
    0 references
    Q3000056 (Deleted Item)
    0 references

    41°16'38.57"N, 8°16'57.47"W
    0 references
    A operação " Requalificação do espaço público da Avenida do Santuário e da Avenida do Alto do Fogo” enquadra-se no Eixo prioritário 4 - Qualidade Ambiental, com a prioridade de investimento 6.5 Adopção de medidas destinadas a melhorar o ambiente urbano, a revitalizar as cidades, recuperar e descontaminar zonas industriais abandonadas, incluindo zonas de reconversão, a reduzir a poluição no ar e a promover medidas de redução de ruido. (Portuguese)
    0 references
    The operation " Requalification of the public space of Avenida do Santuário and Avenida do Alto do Lume is part of Priority Axis 4 – Environmental Quality, with investment priority 6.5 Adoption of measures to improve the urban environment, revitalise cities, recover and decontaminate abandoned industrial areas, including conversion zones, reduce air pollution and promote noise reduction measures. (English)
    8 July 2021
    0 references
    Lousada
    0 references

    Identifiers

    NORTE-04-2316-FEDER-000230
    0 references