Q2894518 (Q2894518): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): The implementation of the proposed improvement measures at the same time presents a total investment of EUR 903 336.44 for a reduction in operating costs of EUR 101,3338.00/year. The final result of these measures is an increase in the efficiency of the installation and the energy classification achieved is A+., translated_summary)
Property / summary
 
The implementation of the proposed improvement measures at the same time presents a total investment of EUR 903 336.44 for a reduction in operating costs of EUR 101,3338.00/year. The final result of these measures is an increase in the efficiency of the installation and the energy classification achieved is A+. (English)
Property / summary: The implementation of the proposed improvement measures at the same time presents a total investment of EUR 903 336.44 for a reduction in operating costs of EUR 101,3338.00/year. The final result of these measures is an increase in the efficiency of the installation and the energy classification achieved is A+. (English) / rank
 
Normal rank
Property / summary: The implementation of the proposed improvement measures at the same time presents a total investment of EUR 903 336.44 for a reduction in operating costs of EUR 101,3338.00/year. The final result of these measures is an increase in the efficiency of the installation and the energy classification achieved is A+. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:51, 8 July 2021

Project Q2894518 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2894518 in Portugal

    Statements

    0 references
    416,845.6 Euro
    0 references
    85.0 percent
    0 references
    1 May 2018
    0 references
    25 November 2021
    0 references
    MUNICÍPIO DE PENAFIEL
    0 references
    Q3000051 (Deleted Item)
    0 references

    41°12'22.28"N, 8°17'8.05"W
    0 references
    A implementação das medidas de melhoria propostas em simultâneo apresentam um investimento total de 903 336,44€, para uma redução de custos de exploração de 101.3338,00€/ano. Estas medidas têm como resultado final um aumento de eficiência da instalação e a classificação energética atingida é A+. (Portuguese)
    0 references
    The implementation of the proposed improvement measures at the same time presents a total investment of EUR 903 336.44 for a reduction in operating costs of EUR 101,3338.00/year. The final result of these measures is an increase in the efficiency of the installation and the energy classification achieved is A+. (English)
    8 July 2021
    0 references
    Penafiel, Penafiel
    0 references

    Identifiers

    NORTE-03-1203-FEDER-000130
    0 references