Change for LED technology fixtures – 2nd phase (Q2894482): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): This operation aims to improve energy efficiency in public lighting and the respective intervention circuits selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support., translated_summary) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Change for LED technology fixtures – 2nd phase |
Revision as of 06:50, 8 July 2021
Project Q2894482 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Change for LED technology fixtures – 2nd phase |
Project Q2894482 in Portugal |
Statements
234,887.07 Euro
0 references
85.0 percent
0 references
1 March 2018
0 references
31 December 2019
0 references
MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
0 references
Q3000779 (Deleted Item)
0 references
Com a presente operação pretende-se a melhoria da eficiência energética na iluminação pública e nos respetivos circuitos alvo de intervenção, selecionados de acordo com critérios de viabilidade técnica e económica. Irão ser substituídas as luminárias existentes por luminárias de LED de alta eficiência e montadas e eletrificadas novas luminárias LED em apoio existente. (Portuguese)
0 references
This operation aims to improve energy efficiency in public lighting and the respective intervention circuits selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support. (English)
8 July 2021
0 references
Oliveira de Azeméis
0 references
Identifiers
NORTE-03-1203-FEDER-000029
0 references