Q2894476 (Q2894476): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Created claim: summary (P836): Acknowledgment and analysis of the IP network of the Municipality was carried out, and with the priority of conducting an intervention that maximises energy efficiency by reducing effective electrical energy consumption with as little investment as possible, the luminotechnical study was carried out, constituting the technical and luminic options, proposing the full exchange of inefficient luminaires for new luminaires equipped with LEDs, transl...)
Property / summary
 
Acknowledgment and analysis of the IP network of the Municipality was carried out, and with the priority of conducting an intervention that maximises energy efficiency by reducing effective electrical energy consumption with as little investment as possible, the luminotechnical study was carried out, constituting the technical and luminic options, proposing the full exchange of inefficient luminaires for new luminaires equipped with LEDs (English)
Property / summary: Acknowledgment and analysis of the IP network of the Municipality was carried out, and with the priority of conducting an intervention that maximises energy efficiency by reducing effective electrical energy consumption with as little investment as possible, the luminotechnical study was carried out, constituting the technical and luminic options, proposing the full exchange of inefficient luminaires for new luminaires equipped with LEDs (English) / rank
 
Normal rank
Property / summary: Acknowledgment and analysis of the IP network of the Municipality was carried out, and with the priority of conducting an intervention that maximises energy efficiency by reducing effective electrical energy consumption with as little investment as possible, the luminotechnical study was carried out, constituting the technical and luminic options, proposing the full exchange of inefficient luminaires for new luminaires equipped with LEDs (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:50, 8 July 2021

Project Q2894476 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2894476 in Portugal

    Statements

    0 references
    263,064.79 Euro
    0 references
    85.0 percent
    0 references
    17 May 2018
    0 references
    30 December 2019
    0 references
    MUNICÍPIO DE VALE DE CAMBRA
    0 references

    40°50'59.32"N, 8°23'38.08"W
    0 references
    Efetuado um reconhecimento e análise da rede de IP do Município, e tendo como prioridade realizar uma intervenção que maximize a eficiência energética através da redução do consumo de energia elétrica efetivo com o mínimo de investimento possível, efetuou-se o estudo luminotécnico que consubstanciam as opções técnico-lumínicas, propondo-se a troca integral de luminárias ineficientes por luminárias nova equipada com LEDs (Portuguese)
    0 references
    Acknowledgment and analysis of the IP network of the Municipality was carried out, and with the priority of conducting an intervention that maximises energy efficiency by reducing effective electrical energy consumption with as little investment as possible, the luminotechnical study was carried out, constituting the technical and luminic options, proposing the full exchange of inefficient luminaires for new luminaires equipped with LEDs (English)
    8 July 2021
    0 references
    Vale de Cambra
    0 references

    Identifiers

    NORTE-03-1203-FEDER-000011
    0 references