(Created claim: summary (P836): The object of the project is the design and construction of a photovoltaic installation with a capacity not exceeding 0,5 MW, producing not less than 452,25 MWhe of energy per year, in the form of distributed photovoltaic fields. The installation will be carried out at 11 Sokołowskiego Street in Szczecin at the Independent Public Provincial Hospital in Szczecin Zdunowo. Details of the scope of work are described in the functional and operational...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the design and construction of a photovoltaic installation with a capacity not exceeding 0,5 MW, producing not less than 452,25 MWhe of energy per year, in the form of distributed photovoltaic fields. The installation will be carried out at 11 Sokołowskiego Street in Szczecin at the Independent Public Provincial Hospital in Szczecin Zdunowo. Details of the scope of work are described in the functional and operational programme attached to the proposal. The generated current will be used for SPWSZ’s own needs. The installation will have security features to prevent energy from flowing into the external grid. The Applicant will be responsible for implementing the project. The Director of the SPWSZ will set up a Project Implementation Team, which will manage the project and oversee the implementation of the contract by the Contractor. An external entity (the Contractor) selected in accordance with the Public Procurement Act, in accordance with the Public Procurement Act, will be responsible for the execution of the construction project and for obtaining a building permit. The contractor will perform the contract in the “design and build” mode. The call for tenders will be carried out by a Tender Committee composed of employees of the SPWSZ, set up by order of the Director of the Regional Independent Public Hospital. THE MOST IMPORTANT STAGES OF THE PROJECT 1. Preparation of a feasibility study. 2. Selecting the contractor in the design and build mode. 3. Preparation of documentation and obtaining the necessary permits. 4. Construction and installation works. 5. Final acceptance of works. 6. Settlement of investments. (English) | |||||||||||||||
Property / summary: The object of the project is the design and construction of a photovoltaic installation with a capacity not exceeding 0,5 MW, producing not less than 452,25 MWhe of energy per year, in the form of distributed photovoltaic fields. The installation will be carried out at 11 Sokołowskiego Street in Szczecin at the Independent Public Provincial Hospital in Szczecin Zdunowo. Details of the scope of work are described in the functional and operational programme attached to the proposal. The generated current will be used for SPWSZ’s own needs. The installation will have security features to prevent energy from flowing into the external grid. The Applicant will be responsible for implementing the project. The Director of the SPWSZ will set up a Project Implementation Team, which will manage the project and oversee the implementation of the contract by the Contractor. An external entity (the Contractor) selected in accordance with the Public Procurement Act, in accordance with the Public Procurement Act, will be responsible for the execution of the construction project and for obtaining a building permit. The contractor will perform the contract in the “design and build” mode. The call for tenders will be carried out by a Tender Committee composed of employees of the SPWSZ, set up by order of the Director of the Regional Independent Public Hospital. THE MOST IMPORTANT STAGES OF THE PROJECT 1. Preparation of a feasibility study. 2. Selecting the contractor in the design and build mode. 3. Preparation of documentation and obtaining the necessary permits. 4. Construction and installation works. 5. Final acceptance of works. 6. Settlement of investments. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the design and construction of a photovoltaic installation with a capacity not exceeding 0,5 MW, producing not less than 452,25 MWhe of energy per year, in the form of distributed photovoltaic fields. The installation will be carried out at 11 Sokołowskiego Street in Szczecin at the Independent Public Provincial Hospital in Szczecin Zdunowo. Details of the scope of work are described in the functional and operational programme attached to the proposal. The generated current will be used for SPWSZ’s own needs. The installation will have security features to prevent energy from flowing into the external grid. The Applicant will be responsible for implementing the project. The Director of the SPWSZ will set up a Project Implementation Team, which will manage the project and oversee the implementation of the contract by the Contractor. An external entity (the Contractor) selected in accordance with the Public Procurement Act, in accordance with the Public Procurement Act, will be responsible for the execution of the construction project and for obtaining a building permit. The contractor will perform the contract in the “design and build” mode. The call for tenders will be carried out by a Tender Committee composed of employees of the SPWSZ, set up by order of the Director of the Regional Independent Public Hospital. THE MOST IMPORTANT STAGES OF THE PROJECT 1. Preparation of a feasibility study. 2. Selecting the contractor in the design and build mode. 3. Preparation of documentation and obtaining the necessary permits. 4. Construction and installation works. 5. Final acceptance of works. 6. Settlement of investments. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 02:23, 8 July 2021
Project Q2718697 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2718697 in Poland |
Statements
3,183,198.15 zloty
0 references
3,744,939.0 zloty
0 references
85.0 percent
0 references
18 February 2020
0 references
28 February 2022
0 references
SAMODZIELNY PUBLICZNY WOJEWÓDZKI SZPITAL ZESPOLONY W SZCZECINIE
0 references
ZAKRES RZECZOWY Przedmiotem projektu jest zaprojektowanie oraz wykonanie instalacji fotowoltaicznej o mocy nie przekraczającej 0,5 MW, produkującej nie mniej niż 452,25 MWhe energii na rok, w formie rozproszonych pól fotowoltaicznych. Instalacja zostanie zrealizowana przy ulicy Sokołowskiego 11 w Szczecinie na terenie Samodzielnego Publicznego Wojewódzkiego Szpitala Zespolonego w Szczecinie Zdunowo. Szczegóły zakres prac został opisany w załączonym do wniosku programie funkcjonalno - użytkowym. Wyprodukowany prąd będzie wykorzystywany na potrzeby własne SPWSZ. Instalacja będzie posiadała zabezpieczenia uniemożliwiające wypływ energii do sieci zewnętrznej. SPOSÓB WDRAŻANIA Za realizację projektu odpowiedzialny będzie Wnioskodawca. Dyrektor SPWSZ powoła Zespół ds. realizacji projektu, który będzie zarządzał projektem oraz nadzorował realizacje umowy przez podmiot Wykonawcę. Za wykonanie projektu budowlanego oraz pozyskanie pozwolenia na budowę odpowiedzialny będzie podmiot zewnętrzny (Wykonawca) wyłoniony zgodnie z ustawą Prawo zamówień publicznych, w trybie przetargu nieograniczonego. Wykonawca będzie realizował kontrakt w trybie „zaprojektuj i wybuduj”. Przetarg zostanie przeprowadzony przez Komisję Przetargową składającą się z pracowników SPWSZ, powołaną zarządzeniem Dyrektora Samodzielnego Publicznego Wojewódzkiego Szpitala Zespolonego. NAJWAŻNIEJSZE ETAPY PROJEKTU 1. Przygotowanie studium wykonalności. 2. Wybór wykonawcy prac w trybie zaprojektuj i wybuduj. 3. Przygotowanie dokumentacji i uzyskanie niezbędnych pozwoleń. 4. Wykonanie prac budowlano-instalacyjnych. 5. Odbiór końcowy robót. 6. Rozliczenie inwestycji. (Polish)
0 references
The object of the project is the design and construction of a photovoltaic installation with a capacity not exceeding 0,5 MW, producing not less than 452,25 MWhe of energy per year, in the form of distributed photovoltaic fields. The installation will be carried out at 11 Sokołowskiego Street in Szczecin at the Independent Public Provincial Hospital in Szczecin Zdunowo. Details of the scope of work are described in the functional and operational programme attached to the proposal. The generated current will be used for SPWSZ’s own needs. The installation will have security features to prevent energy from flowing into the external grid. The Applicant will be responsible for implementing the project. The Director of the SPWSZ will set up a Project Implementation Team, which will manage the project and oversee the implementation of the contract by the Contractor. An external entity (the Contractor) selected in accordance with the Public Procurement Act, in accordance with the Public Procurement Act, will be responsible for the execution of the construction project and for obtaining a building permit. The contractor will perform the contract in the “design and build” mode. The call for tenders will be carried out by a Tender Committee composed of employees of the SPWSZ, set up by order of the Director of the Regional Independent Public Hospital. THE MOST IMPORTANT STAGES OF THE PROJECT 1. Preparation of a feasibility study. 2. Selecting the contractor in the design and build mode. 3. Preparation of documentation and obtaining the necessary permits. 4. Construction and installation works. 5. Final acceptance of works. 6. Settlement of investments. (English)
8 July 2021
0 references
Identifiers
RPZP.02.10.00-32-C100/20
0 references