Q2712373 (Q2712373): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project will consist of the reconstruction and adaptation of the building in my use. It is a building erected before World War II. Unfortunately, the roof leaked in it for a long time, and it was completely excluded from use. As part of the project, the old, leaking roof will be removed and replaced by the necessary elements, such as ceilings, insulated walls, so that the building can be used all year round. The attic will also be built so t...)
Property / summary
 
The project will consist of the reconstruction and adaptation of the building in my use. It is a building erected before World War II. Unfortunately, the roof leaked in it for a long time, and it was completely excluded from use. As part of the project, the old, leaking roof will be removed and replaced by the necessary elements, such as ceilings, insulated walls, so that the building can be used all year round. The attic will also be built so that the resulting surfaces can be used even more effectively. sanitary and electrical installations will also be made. These are the work necessary to be able to use the surface, so that those who are waiting for a ride or who are waiting for a ride do not have to wait in the car or outside, outside the stable. (English)
Property / summary: The project will consist of the reconstruction and adaptation of the building in my use. It is a building erected before World War II. Unfortunately, the roof leaked in it for a long time, and it was completely excluded from use. As part of the project, the old, leaking roof will be removed and replaced by the necessary elements, such as ceilings, insulated walls, so that the building can be used all year round. The attic will also be built so that the resulting surfaces can be used even more effectively. sanitary and electrical installations will also be made. These are the work necessary to be able to use the surface, so that those who are waiting for a ride or who are waiting for a ride do not have to wait in the car or outside, outside the stable. (English) / rank
 
Normal rank
Property / summary: The project will consist of the reconstruction and adaptation of the building in my use. It is a building erected before World War II. Unfortunately, the roof leaked in it for a long time, and it was completely excluded from use. As part of the project, the old, leaking roof will be removed and replaced by the necessary elements, such as ceilings, insulated walls, so that the building can be used all year round. The attic will also be built so that the resulting surfaces can be used even more effectively. sanitary and electrical installations will also be made. These are the work necessary to be able to use the surface, so that those who are waiting for a ride or who are waiting for a ride do not have to wait in the car or outside, outside the stable. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:07, 7 July 2021

Project Q2712373 in Poland
Language Label Description Also known as
English
No label defined
Project Q2712373 in Poland

    Statements

    0 references
    235,397.14 zloty
    0 references
    52,328.78 Euro
    0.2223 Euro
    0 references
    276,937.81 zloty
    0 references
    61,563.28 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    24 June 2020
    0 references
    30 June 2021
    0 references
    NAUKA JAZDY KONNEJ KAMILA KOTARSKA
    0 references
    0 references

    53°51'32.0"N, 16°57'48.2"E
    0 references
    Projekt polegać będzie na przebudowie i adaptacji budynku w moim użytkowaniu. Jest to budynek postawiony jeszcze przed II wojną światową, niestety od dłuższego czasu przecieka w nim dach przez co zupełnie został wyłączony z użytkowania. w ramach projektu zostanie zdjęty i wymieniony stary, przeciekający dach, wymienione zostaną zniszczone przez warunki atmosferyczne niezbędne elementy jak np. stropy, docieplone ściany dzięki czemu z budynku będzie można korzystać cały rok. zabudowane zostanie także poddasze aby można było jeszcze bardziej efektywnie wykorzystywać otrzymane powierzchnie. wykonane zostaną także instalacje sanitarna i elektryczna. Są to prace niezbędne do tego aby móc wykorzystać powierzchnię, do tego aby osoby oczekujące na jazdę lub oczekujące na jeżdżącego nie musiały oczekiwać w aucie lub na zewnątrz, poza tereem stajni. (Polish)
    0 references
    The project will consist of the reconstruction and adaptation of the building in my use. It is a building erected before World War II. Unfortunately, the roof leaked in it for a long time, and it was completely excluded from use. As part of the project, the old, leaking roof will be removed and replaced by the necessary elements, such as ceilings, insulated walls, so that the building can be used all year round. The attic will also be built so that the resulting surfaces can be used even more effectively. sanitary and electrical installations will also be made. These are the work necessary to be able to use the surface, so that those who are waiting for a ride or who are waiting for a ride do not have to wait in the car or outside, outside the stable. (English)
    8 July 2021
    0 references

    Identifiers

    RPPM.02.02.01-22-0314/20
    0 references