Q2711840 (Q2711840): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The main objective of the project is to improve the technical infrastructure in the municipality, which will allow for better conditions for the further development of the municipality of Niwiska by exploiting favourable environmental conditions, as well as to ensure that the living standards of the municipality’s population are maintained and progressively increased by improving the water supply from the network. Its implementation will also co...)
Property / summary
 
The main objective of the project is to improve the technical infrastructure in the municipality, which will allow for better conditions for the further development of the municipality of Niwiska by exploiting favourable environmental conditions, as well as to ensure that the living standards of the municipality’s population are maintained and progressively increased by improving the water supply from the network. Its implementation will also contribute to a more active approach to environmental protection, as well as to the improvement of the overall socio-economic climate in the municipality.The scope of the planned investment includes: • construction of a water supply network with a length of approximately L = 5200.0 m and diameters of 90 mm and O315 mm,• installation of above-ground hydrants Dn80 mm with gate valves,• installation of Dn300 mm shut-off valves,• installation of a submersible pump with capacity Q=55 m³/h and H=30 m (water intake),• assembly of pump kit with control and monitoring of work (pumping station on SUW), • the power generator (SUW pumping station). The construction of a water supply and the supply of treated water through it will ensure that the dangers associated with the consumption of non-compliant water are addressed. It will allow the elimination of bacteriological and chemical contaminants, will contribute to improving the health of residents. (English)
Property / summary: The main objective of the project is to improve the technical infrastructure in the municipality, which will allow for better conditions for the further development of the municipality of Niwiska by exploiting favourable environmental conditions, as well as to ensure that the living standards of the municipality’s population are maintained and progressively increased by improving the water supply from the network. Its implementation will also contribute to a more active approach to environmental protection, as well as to the improvement of the overall socio-economic climate in the municipality.The scope of the planned investment includes: • construction of a water supply network with a length of approximately L = 5200.0 m and diameters of 90 mm and O315 mm,• installation of above-ground hydrants Dn80 mm with gate valves,• installation of Dn300 mm shut-off valves,• installation of a submersible pump with capacity Q=55 m³/h and H=30 m (water intake),• assembly of pump kit with control and monitoring of work (pumping station on SUW), • the power generator (SUW pumping station). The construction of a water supply and the supply of treated water through it will ensure that the dangers associated with the consumption of non-compliant water are addressed. It will allow the elimination of bacteriological and chemical contaminants, will contribute to improving the health of residents. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to improve the technical infrastructure in the municipality, which will allow for better conditions for the further development of the municipality of Niwiska by exploiting favourable environmental conditions, as well as to ensure that the living standards of the municipality’s population are maintained and progressively increased by improving the water supply from the network. Its implementation will also contribute to a more active approach to environmental protection, as well as to the improvement of the overall socio-economic climate in the municipality.The scope of the planned investment includes: • construction of a water supply network with a length of approximately L = 5200.0 m and diameters of 90 mm and O315 mm,• installation of above-ground hydrants Dn80 mm with gate valves,• installation of Dn300 mm shut-off valves,• installation of a submersible pump with capacity Q=55 m³/h and H=30 m (water intake),• assembly of pump kit with control and monitoring of work (pumping station on SUW), • the power generator (SUW pumping station). The construction of a water supply and the supply of treated water through it will ensure that the dangers associated with the consumption of non-compliant water are addressed. It will allow the elimination of bacteriological and chemical contaminants, will contribute to improving the health of residents. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:55, 7 July 2021

Project Q2711840 in Poland
Language Label Description Also known as
English
No label defined
Project Q2711840 in Poland

    Statements

    0 references
    1,496,718.95 zloty
    0 references
    332,720.62 Euro
    0.2223 Euro
    0 references
    1,763,958.7 zloty
    0 references
    392,128.02 Euro
    0.2223 Euro
    0 references
    84.85 percent
    0 references
    1 April 2019
    0 references
    31 January 2021
    0 references
    GMINA NIWISKA
    0 references
    0 references

    50°13'28.2"N, 21°37'11.6"E
    0 references
    Głównym celem projektu jest poprawa infrastruktury technicznej na terenie gminy, co umożliwi zapewnienie lepszych warunków do dalszego rozwoju gminy Niwiska poprzez wykorzystanie korzystnych warunków otoczenia, a także zapewnienie utrzymania i sukcesywnego wzrostu poziomu życia ludności gminy poprzez poprawę zaopatrzenia w wodę z sieci. Jego realizacja przyczyni się ponadto do wytworzenia bardziej aktywnej postawy w zakresie ochrony środowiska naturalnego, a także poprawy ogólnego klimatu społeczno-gospodarczego, jaki panuje na terenie gminy.Zakres planowanej inwestycji obejmuje: • budowę sieci wodociągowej o długości około L = 5 200,0 m i średnicach O 90 mm oraz O315 mm,• montaż hydrantów nadziemnych Dn80 mm z zasuwami,• montaż zasuw odcinających Dn300 mm,• montaż pompy głębinowej o wydajności Q=55 m3/h i H=30 m (ujęcie wody),• montaż zestawu pompowego wraz ze sterowaniem i monitoringiem pracy (przepompownia na SUW),• agregat prądotwórczy (przepompownia na SUW).Budowa wodociągu i dostarczanie dzięki niemu mieszkańcom uzdatnionej wody zapewni zażegnanie niebezpieczeństw związanych ze spożywaniem niespełniającej wymogów sanitarnych wody. Pozwoli na eliminacje zanieczyszczeń bakteriologicznych oraz zanieczyszczeń chemicznych, przyczyni się do poprawy zdrowotności mieszkańców. (Polish)
    0 references
    The main objective of the project is to improve the technical infrastructure in the municipality, which will allow for better conditions for the further development of the municipality of Niwiska by exploiting favourable environmental conditions, as well as to ensure that the living standards of the municipality’s population are maintained and progressively increased by improving the water supply from the network. Its implementation will also contribute to a more active approach to environmental protection, as well as to the improvement of the overall socio-economic climate in the municipality.The scope of the planned investment includes: • construction of a water supply network with a length of approximately L = 5200.0 m and diameters of 90 mm and O315 mm,• installation of above-ground hydrants Dn80 mm with gate valves,• installation of Dn300 mm shut-off valves,• installation of a submersible pump with capacity Q=55 m³/h and H=30 m (water intake),• assembly of pump kit with control and monitoring of work (pumping station on SUW), • the power generator (SUW pumping station). The construction of a water supply and the supply of treated water through it will ensure that the dangers associated with the consumption of non-compliant water are addressed. It will allow the elimination of bacteriological and chemical contaminants, will contribute to improving the health of residents. (English)
    8 July 2021
    0 references

    Identifiers

    RPPK.04.03.02-18-0044/18
    0 references