Q2708151 (Q2708151): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): As part of the project, support will be provided for the implementation of projects concerning the elimination of “low emissions” in the municipality of Pułtusk. The actions taken will be aimed at replacing old boilers, stoves, heating appliances using solid fuels with heat sources burning biomass or using gaseous fuels. The project will replace the heating medium (boilers, stoves, heating appliances) in households. Energy certificates have been...)
Property / summary
 
As part of the project, support will be provided for the implementation of projects concerning the elimination of “low emissions” in the municipality of Pułtusk. The actions taken will be aimed at replacing old boilers, stoves, heating appliances using solid fuels with heat sources burning biomass or using gaseous fuels. The project will replace the heating medium (boilers, stoves, heating appliances) in households. Energy certificates have been carried out for all facilities, which have confirmed that the minimum energy conditions have been met, i.e. the building needs for non-renewable primary energy for heating, ventilation, cooling, domestic hot water preparation and lighting for single-family houses shall not exceed 150 kWh/(m² x year) and for multi-family houses shall not exceed 135 kWh/(m² x year). In total, the project will cover 103 households and 1 multi-family building. The projects will be carried out in the municipality with exceeded permissible and target levels of substances in the air – in particular particulate matter PM 10 – Kryt. 3. The applicant plans to prepare a support programme for the poorest people who, as a result of the implementation of the project, will bear the increased heating costs of the premises due to the permanent change of the heating system – Kryt.8. In addition, the project is implemented in medium-sized cities losing socio-economic functions and depopulating. According to the “Strategy for Responsible Development” (SOR) – Kryt. 9 (English)
Property / summary: As part of the project, support will be provided for the implementation of projects concerning the elimination of “low emissions” in the municipality of Pułtusk. The actions taken will be aimed at replacing old boilers, stoves, heating appliances using solid fuels with heat sources burning biomass or using gaseous fuels. The project will replace the heating medium (boilers, stoves, heating appliances) in households. Energy certificates have been carried out for all facilities, which have confirmed that the minimum energy conditions have been met, i.e. the building needs for non-renewable primary energy for heating, ventilation, cooling, domestic hot water preparation and lighting for single-family houses shall not exceed 150 kWh/(m² x year) and for multi-family houses shall not exceed 135 kWh/(m² x year). In total, the project will cover 103 households and 1 multi-family building. The projects will be carried out in the municipality with exceeded permissible and target levels of substances in the air – in particular particulate matter PM 10 – Kryt. 3. The applicant plans to prepare a support programme for the poorest people who, as a result of the implementation of the project, will bear the increased heating costs of the premises due to the permanent change of the heating system – Kryt.8. In addition, the project is implemented in medium-sized cities losing socio-economic functions and depopulating. According to the “Strategy for Responsible Development” (SOR) – Kryt. 9 (English) / rank
 
Normal rank
Property / summary: As part of the project, support will be provided for the implementation of projects concerning the elimination of “low emissions” in the municipality of Pułtusk. The actions taken will be aimed at replacing old boilers, stoves, heating appliances using solid fuels with heat sources burning biomass or using gaseous fuels. The project will replace the heating medium (boilers, stoves, heating appliances) in households. Energy certificates have been carried out for all facilities, which have confirmed that the minimum energy conditions have been met, i.e. the building needs for non-renewable primary energy for heating, ventilation, cooling, domestic hot water preparation and lighting for single-family houses shall not exceed 150 kWh/(m² x year) and for multi-family houses shall not exceed 135 kWh/(m² x year). In total, the project will cover 103 households and 1 multi-family building. The projects will be carried out in the municipality with exceeded permissible and target levels of substances in the air – in particular particulate matter PM 10 – Kryt. 3. The applicant plans to prepare a support programme for the poorest people who, as a result of the implementation of the project, will bear the increased heating costs of the premises due to the permanent change of the heating system – Kryt.8. In addition, the project is implemented in medium-sized cities losing socio-economic functions and depopulating. According to the “Strategy for Responsible Development” (SOR) – Kryt. 9 (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:22, 7 July 2021

Project Q2708151 in Poland
Language Label Description Also known as
English
No label defined
Project Q2708151 in Poland

    Statements

    0 references
    1,484,596.55 zloty
    0 references
    330,025.81 Euro
    0.2223 Euro
    0 references
    2,010,779.58 zloty
    0 references
    446,996.3 Euro
    0.2223 Euro
    0 references
    73.83 percent
    0 references
    1 April 2018
    0 references
    31 December 2022
    0 references
    GMINA PUŁTUSK
    0 references

    52°42'18.4"N, 21°5'2.4"E
    0 references
    W ramach projektu wsparcie udzielane będzie na realizację projektów dotyczących likwidacji „niskiej emisji” w Gminie Pułtusk. Podjęte działania skierowane będą na wymianę starych kotłów, pieców, urządzeń grzewczych wykorzystujących paliwa stałe na źródła ciepła spalające biomasę lub wykorzystujące paliwa gazowe. W ramach projektu nastąpi wymiana czynnika grzewczego (kotłów, pieców, urządzeń grzewczych) w gospodarstwach domowych. Dla wszystkich obiektów wykonano świadectwa energetyczne, które potwierdziły spełnienie minimalnych warunków energetycznych, tj; zapotrzebowanie budynku na nieodnawialną energię pierwotną do ogrzewania, wentylacji, chłodzenia, przygotowania ciepłej wody użytkowej oraz oświetlenia w przypadku domów jednorodzinnych nie przekracza 150 kWh/(m2 x rok), zaś dla domów wielorodzinnych nie przekracza wartości 135 kWh/(m2 x rok). W sumie projekt obejmie 103 gospodarstwa domowe i 1 budynek wielorodzinny. Projekty realizowany będzie na terenie gminy o przekroczonych dopuszczalnych i docelowych poziomach substancji w powietrzu – w szczególności pyłu zawieszonego PM 10 - Kryt. 3. Wnioskodawca planuje przygotowanie programu wsparcia dla najuboższych osób, które w wyniku realizacji projektu będą ponosić zwiększone koszty grzewcze lokalu związane z trwałą zmianą systemu ogrzewania - Kryt.8. Ponadto projekt realizowany jest na terenie miast średnich tracących funkcje społeczno-gospodarcze i ulegających depopulacji . Zgodnie ze „Strategią na rzecz Odpowiedzialnego Rozwoju” (SOR) - Kryt. 9 (Polish)
    0 references
    As part of the project, support will be provided for the implementation of projects concerning the elimination of “low emissions” in the municipality of Pułtusk. The actions taken will be aimed at replacing old boilers, stoves, heating appliances using solid fuels with heat sources burning biomass or using gaseous fuels. The project will replace the heating medium (boilers, stoves, heating appliances) in households. Energy certificates have been carried out for all facilities, which have confirmed that the minimum energy conditions have been met, i.e. the building needs for non-renewable primary energy for heating, ventilation, cooling, domestic hot water preparation and lighting for single-family houses shall not exceed 150 kWh/(m² x year) and for multi-family houses shall not exceed 135 kWh/(m² x year). In total, the project will cover 103 households and 1 multi-family building. The projects will be carried out in the municipality with exceeded permissible and target levels of substances in the air – in particular particulate matter PM 10 – Kryt. 3. The applicant plans to prepare a support programme for the poorest people who, as a result of the implementation of the project, will bear the increased heating costs of the premises due to the permanent change of the heating system – Kryt.8. In addition, the project is implemented in medium-sized cities losing socio-economic functions and depopulating. According to the “Strategy for Responsible Development” (SOR) – Kryt. 9 (English)
    7 July 2021
    0 references

    Identifiers

    RPMA.04.03.01-14-D285/19
    0 references