Q2706197 (Q2706197): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The aim of the project (P) is to fix the quality of the natural environment in the Municipality of Serniki by replacing street lighting with energ. As part of P, works will be carried out consisting of reducing installed power of luminaires (axis) thanks to the implementation of low-carbon technologies, i.e. LED-type sources: dismantling of an existing and inefficient lighting system (disassembly of an existing system); installation of effective...)
Property / summary
 
The aim of the project (P) is to fix the quality of the natural environment in the Municipality of Serniki by replacing street lighting with energ. As part of P, works will be carried out consisting of reducing installed power of luminaires (axis) thanks to the implementation of low-carbon technologies, i.e. LED-type sources: dismantling of an existing and inefficient lighting system (disassembly of an existing system); installation of effective axles. (mounting of LED-type luminaires in the amount of 542 pcs; installation of tubular booms and steel structures for overhead line fittings on the boom; installation of wires to the axles, fuse boxes, insulated cable connectors, reactive power compensation systems and anti-circuit protection. In addition, P presupposes the implementation of a light flux control system and monitoring with the creation of a dispatching centre (CD) and promotional activities related to the mini. energy consumption and reduction of energy intensity. P will have a positive impact on increasing the quality of the installation’s use and lowering the costs associated with energy consumption and maintenance. As a result of the implementation of P, there will be a significant redefinition of existing capacity of 70.3 % (before the implementation of P, the installed capacity of the system at 79.1 kW, after implementation of P: 23,34 kW). P is also beneficial in terms of achieving the environmental objectives of reducing air pollution and increasing the natural attractiveness of the municipality’s area. This project is consistent with the ‘PGN for Serniki Municipality’, which aims to improve air quality to limit and target levels, including by reducing emissions through the exchange of street lighting with energosz. P assumes an annual reduction in e.p. by 621.67 MWh (-64 %),177.61 tCO2/year and a reduction of other emissions.P assumes the creation of a CD enabling continuous monitoring of the system’s operation including electricity consumption (final energy consumption), monitoring will also include analysis of invoices from e.e. suppliers. (English)
Property / summary: The aim of the project (P) is to fix the quality of the natural environment in the Municipality of Serniki by replacing street lighting with energ. As part of P, works will be carried out consisting of reducing installed power of luminaires (axis) thanks to the implementation of low-carbon technologies, i.e. LED-type sources: dismantling of an existing and inefficient lighting system (disassembly of an existing system); installation of effective axles. (mounting of LED-type luminaires in the amount of 542 pcs; installation of tubular booms and steel structures for overhead line fittings on the boom; installation of wires to the axles, fuse boxes, insulated cable connectors, reactive power compensation systems and anti-circuit protection. In addition, P presupposes the implementation of a light flux control system and monitoring with the creation of a dispatching centre (CD) and promotional activities related to the mini. energy consumption and reduction of energy intensity. P will have a positive impact on increasing the quality of the installation’s use and lowering the costs associated with energy consumption and maintenance. As a result of the implementation of P, there will be a significant redefinition of existing capacity of 70.3 % (before the implementation of P, the installed capacity of the system at 79.1 kW, after implementation of P: 23,34 kW). P is also beneficial in terms of achieving the environmental objectives of reducing air pollution and increasing the natural attractiveness of the municipality’s area. This project is consistent with the ‘PGN for Serniki Municipality’, which aims to improve air quality to limit and target levels, including by reducing emissions through the exchange of street lighting with energosz. P assumes an annual reduction in e.p. by 621.67 MWh (-64 %),177.61 tCO2/year and a reduction of other emissions.P assumes the creation of a CD enabling continuous monitoring of the system’s operation including electricity consumption (final energy consumption), monitoring will also include analysis of invoices from e.e. suppliers. (English) / rank
 
Normal rank
Property / summary: The aim of the project (P) is to fix the quality of the natural environment in the Municipality of Serniki by replacing street lighting with energ. As part of P, works will be carried out consisting of reducing installed power of luminaires (axis) thanks to the implementation of low-carbon technologies, i.e. LED-type sources: dismantling of an existing and inefficient lighting system (disassembly of an existing system); installation of effective axles. (mounting of LED-type luminaires in the amount of 542 pcs; installation of tubular booms and steel structures for overhead line fittings on the boom; installation of wires to the axles, fuse boxes, insulated cable connectors, reactive power compensation systems and anti-circuit protection. In addition, P presupposes the implementation of a light flux control system and monitoring with the creation of a dispatching centre (CD) and promotional activities related to the mini. energy consumption and reduction of energy intensity. P will have a positive impact on increasing the quality of the installation’s use and lowering the costs associated with energy consumption and maintenance. As a result of the implementation of P, there will be a significant redefinition of existing capacity of 70.3 % (before the implementation of P, the installed capacity of the system at 79.1 kW, after implementation of P: 23,34 kW). P is also beneficial in terms of achieving the environmental objectives of reducing air pollution and increasing the natural attractiveness of the municipality’s area. This project is consistent with the ‘PGN for Serniki Municipality’, which aims to improve air quality to limit and target levels, including by reducing emissions through the exchange of street lighting with energosz. P assumes an annual reduction in e.p. by 621.67 MWh (-64 %),177.61 tCO2/year and a reduction of other emissions.P assumes the creation of a CD enabling continuous monitoring of the system’s operation including electricity consumption (final energy consumption), monitoring will also include analysis of invoices from e.e. suppliers. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:25, 7 July 2021

Project Q2706197 in Poland
Language Label Description Also known as
English
No label defined
Project Q2706197 in Poland

    Statements

    0 references
    964,772.37 zloty
    0 references
    214,468.9 Euro
    0.2223 Euro
    0 references
    1,135,026.32 zloty
    0 references
    252,316.35 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    7 November 2019
    0 references
    31 December 2021
    0 references
    GMINA SERNIKI
    0 references
    0 references

    51°26'13.6"N, 22°39'29.2"E
    0 references
    Celem projektu (P) jest oprawa jakości środowiska naturalnego w Gminie Serniki dzięki wymianie oświetlenia ulicznego na energ.W ramach P wykonane zostaną prace polegające na zmniejszeniu zainstalowanych mocy opraw oświetleniowych (o. oś.) dzięki wdrożeniu technologii niskoemisyjnych tj. źródeł typu LED: demontaż istniejącego i nieefektywnego systemu oświetlenia (demontaż istniejącego systemu); montaż efektywnych o.oś. (montaż opraw oś. typu LED w ilości 542 szt.; montaż wysięgników rurowych oraz konstrukcji stalowych dla osprzętu linii napowietrznych na wysięgniku; montaż przewodów do o.oś., skrzynek bezpiecznikowych, izolowanych złącz kablowych, układów kompensacji mocy biernej i zabezpieczeniem przeciwprzepieciowym. Dodatkowo P zakłada wdrożenie systemu sterowania strumieniem świetlnym oraz monitoringiem wraz z utworzeniem centrum dyspozytorskiego (CD)oraz działania promocyjno-inf.dotyczące mini. konsumpcji energii i zmniejszenie energochłonności. P będzie pozytywnie wpływał na wzrost jakości użytkowania instalacji oraz obniżanie kosztów związanych ze zużyciem energii oraz konserwacją. W wyniku realizacji P nastąpi znaczna red. mocy istniejących o.oś. tj. o 70,3% (przed realizacją P moc zainstalowana systemu na poziomie 79,1 kW, po realizacji P: 23,34 kW). P jest również korzystny ze względu na realizację celów środowiskowych jakimi są obniżenie zanieczyszczeń powietrza oraz podniesienie atrakcyjności przyrodniczej terenu gminy. Przedmiotowy projekt jest spójny zgodny z "PGN dla Gminy Serniki, którego celem jest poprawa jakości powietrza do poziomów dopuszczalnych i docelowych, mi.in. poprzez ograniczenie emisji dzięki przeprowadzonej wymianie oświetlenia ulicznego na energoosz. P zakłada roczne zmniejszenie e.p. na o 621,67MWh (-64%),177,61 tCO2/rok oraz zmniejszenie innych emisji.P zakłada utworzenie CD umożliwiającego stały monitoring pracy systemu w tym zużycia energii elektrycznej (końcowej), monitoring obejmie również analizę faktur od dostawców e.e. (Polish)
    0 references
    The aim of the project (P) is to fix the quality of the natural environment in the Municipality of Serniki by replacing street lighting with energ. As part of P, works will be carried out consisting of reducing installed power of luminaires (axis) thanks to the implementation of low-carbon technologies, i.e. LED-type sources: dismantling of an existing and inefficient lighting system (disassembly of an existing system); installation of effective axles. (mounting of LED-type luminaires in the amount of 542 pcs; installation of tubular booms and steel structures for overhead line fittings on the boom; installation of wires to the axles, fuse boxes, insulated cable connectors, reactive power compensation systems and anti-circuit protection. In addition, P presupposes the implementation of a light flux control system and monitoring with the creation of a dispatching centre (CD) and promotional activities related to the mini. energy consumption and reduction of energy intensity. P will have a positive impact on increasing the quality of the installation’s use and lowering the costs associated with energy consumption and maintenance. As a result of the implementation of P, there will be a significant redefinition of existing capacity of 70.3 % (before the implementation of P, the installed capacity of the system at 79.1 kW, after implementation of P: 23,34 kW). P is also beneficial in terms of achieving the environmental objectives of reducing air pollution and increasing the natural attractiveness of the municipality’s area. This project is consistent with the ‘PGN for Serniki Municipality’, which aims to improve air quality to limit and target levels, including by reducing emissions through the exchange of street lighting with energosz. P assumes an annual reduction in e.p. by 621.67 MWh (-64 %),177.61 tCO2/year and a reduction of other emissions.P assumes the creation of a CD enabling continuous monitoring of the system’s operation including electricity consumption (final energy consumption), monitoring will also include analysis of invoices from e.e. suppliers. (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.05.05.00-06-0045/19
    0 references