Pedestrian and cyclable connection North Zone/CHE (Q2863275): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Q2986425 (Deleted Item)
Property / beneficiary: Q2986425 (Deleted Item) / rank
 
Normal rank

Revision as of 18:39, 7 July 2021

Project Q2863275 in Portugal
Language Label Description Also known as
English
Pedestrian and cyclable connection North Zone/CHE
Project Q2863275 in Portugal

    Statements

    0 references
    289,214.03 Euro
    0 references
    85.0 percent
    0 references
    30 May 2019
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DE ÉVORA
    0 references
    Q2986425 (Deleted Item)
    0 references

    38°36'43.60"N, 7°56'16.37"W
    0 references
    Esta intervenção está localizada entre as Portas de Aviz, entrada norte do centro histórico de Évora, e o Bairro do Bacêlo, Estrada da Chainha CM1097, mais concretamente até à Escola Básica Galopim de Carvalho, prevê a introdução de modos suaves (ciclável e pedonal). (Portuguese)
    0 references
    This intervention is located between the Portas de Aviz, north entrance to the historical center of Évora, and the Freguesia do Bacêlo, Estrada da Chainha CM1097, more specifically until the Escola Básica Galopim de Carvalho, provides for the introduction of soft modes (cyclable and pedestrian). (English)
    6 July 2021
    0 references
    Évora, União das freguesias de Bacelo e Senhora da Saúde
    0 references

    Identifiers

    ALT20-04-1406-FEDER-000034
    0 references