(‎Created claim: summary (P836): The object of the project is to carry out a comprehensive refurbishment of the front barrier of the Lakesko water reservoir. The homogeneous earth barrier made of medium grain sands with a reinforced concrete slope screen is located in km 484+ 300 of the Warta River. Its purpose is to imbue the water in the tank. Thanks to the high quality of the facility, the reservoir “Jeziorsko” has a retention function and provides flood safety (protection i...)
Property / summary
 
The object of the project is to carry out a comprehensive refurbishment of the front barrier of the Lakesko water reservoir. The homogeneous earth barrier made of medium grain sands with a reinforced concrete slope screen is located in km 484+ 300 of the Warta River. Its purpose is to imbue the water in the tank. Thanks to the high quality of the facility, the reservoir “Jeziorsko” has a retention function and provides flood safety (protection in case of floods). The project assumes the following tasks: Activity 1. Works and tasks listed as indirect costs: — information and promotion. The purpose of the works is to repair individual elements of the front barrier screen, consisting mainly of the restoration of the original state (when allowed to use construction products other than those used in the original state). The work is necessary in order to achieve adequate flood safety. The project will be in line with the concept of universal design – the project will not create new infrastructure. The implementation of tasks has a significant impact on directing public tourism and recreational traffic in areas of valuable nature and surrounding the reservoir, creating favourable conditions for society as a whole. Output indicators Number of refurbished equipment for flood protection purposes: 1 pcs. Result indicators Number of population benefiting from flood protection measures (CI20): 536 persons The area covered by flood protection: 10926,90 ha (English)
Property / summary: The object of the project is to carry out a comprehensive refurbishment of the front barrier of the Lakesko water reservoir. The homogeneous earth barrier made of medium grain sands with a reinforced concrete slope screen is located in km 484+ 300 of the Warta River. Its purpose is to imbue the water in the tank. Thanks to the high quality of the facility, the reservoir “Jeziorsko” has a retention function and provides flood safety (protection in case of floods). The project assumes the following tasks: Activity 1. Works and tasks listed as indirect costs: — information and promotion. The purpose of the works is to repair individual elements of the front barrier screen, consisting mainly of the restoration of the original state (when allowed to use construction products other than those used in the original state). The work is necessary in order to achieve adequate flood safety. The project will be in line with the concept of universal design – the project will not create new infrastructure. The implementation of tasks has a significant impact on directing public tourism and recreational traffic in areas of valuable nature and surrounding the reservoir, creating favourable conditions for society as a whole. Output indicators Number of refurbished equipment for flood protection purposes: 1 pcs. Result indicators Number of population benefiting from flood protection measures (CI20): 536 persons The area covered by flood protection: 10926,90 ha (English) / rank
 
Normal rank
Property / summary: The object of the project is to carry out a comprehensive refurbishment of the front barrier of the Lakesko water reservoir. The homogeneous earth barrier made of medium grain sands with a reinforced concrete slope screen is located in km 484+ 300 of the Warta River. Its purpose is to imbue the water in the tank. Thanks to the high quality of the facility, the reservoir “Jeziorsko” has a retention function and provides flood safety (protection in case of floods). The project assumes the following tasks: Activity 1. Works and tasks listed as indirect costs: — information and promotion. The purpose of the works is to repair individual elements of the front barrier screen, consisting mainly of the restoration of the original state (when allowed to use construction products other than those used in the original state). The work is necessary in order to achieve adequate flood safety. The project will be in line with the concept of universal design – the project will not create new infrastructure. The implementation of tasks has a significant impact on directing public tourism and recreational traffic in areas of valuable nature and surrounding the reservoir, creating favourable conditions for society as a whole. Output indicators Number of refurbished equipment for flood protection purposes: 1 pcs. Result indicators Number of population benefiting from flood protection measures (CI20): 536 persons The area covered by flood protection: 10926,90 ha (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:39, 7 July 2021

Project Q2702370 in Poland
Language Label Description Also known as
English
No label defined
Project Q2702370 in Poland

    Statements

    0 references
    28,678,090.78 zloty
    0 references
    6,375,139.58 Euro
    0.2223 Euro
    0 references
    33,738,930.33 zloty
    0 references
    7,500,164.21 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    30 October 2019
    0 references
    30 April 2023
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
    0 references
    0 references

    51°48'12.6"N, 18°43'19.2"E
    0 references
    Przedmiotem projektu jest przeprowadzenie kompleksowego remontu ekranu zapory czołowej zbiornika wodnego Jeziorsko. Zapora ziemna jednorodna wykonana z piasków średnioziarnistych z żelbetowym ekranem skarpowym, zlokalizowana jest w km 484+300 rzeki Warty. Jej celem jest piętrzenie wody w zbiorniku. Dzięki wysokiej jakości obiektu zbiornik „Jeziorsko” spełnia funkcję retencyjną oraz zapewnia bezpieczeństwo przeciwpowodziowe (ochrona na wypadek powodzi). Projekt zakłada realizację następujących zadań: Zadanie 1. Roboty budowlane A także zadania wyszczególnionego jako koszty pośrednie: - informacja i promocja. Celem wykonania robót jest naprawa poszczególnych elementów ekranu zapory czołowej, polegających na głównie na odtwarzaniu stanu pierwotnego (przy dopuszczeniu zastosowania wyrobów budowlanych innych niż użyto w stanie pierwotnym). Prace są niezbędnie konieczne w celu uzyskania odpowiedniego bezpieczeństwa przeciwpowodziowego. Projekt będzie zgodny z koncepcją projektowania uniwersalnego - w ramach projektu nie zostanie wytworzona nowa infrastruktura. Realiz. zadania ma istotny wpływ na ukierunkowanie ogólnodostępnego ruchu turystycz. i rekreacyjnego na obszarach cennych przyrodniczo i leżących wokół zbiornika, stworzenie dogodnych warunków dla całego społeczeństwa. Wskaźniki produktu Liczba wyremontowanych urządzeń dla celów ochrony przeciwpowodziowej: 1 szt. Wskaźniki rezultatu Liczba ludności odnoszącej korzyści ze środków ochrony przeciwpowodziowej (CI20): 536 osób Powierzchnia terenu objęta ochroną przeciwpowodziową: 10 926,90 ha (Polish)
    0 references
    The object of the project is to carry out a comprehensive refurbishment of the front barrier of the Lakesko water reservoir. The homogeneous earth barrier made of medium grain sands with a reinforced concrete slope screen is located in km 484+ 300 of the Warta River. Its purpose is to imbue the water in the tank. Thanks to the high quality of the facility, the reservoir “Jeziorsko” has a retention function and provides flood safety (protection in case of floods). The project assumes the following tasks: Activity 1. Works and tasks listed as indirect costs: — information and promotion. The purpose of the works is to repair individual elements of the front barrier screen, consisting mainly of the restoration of the original state (when allowed to use construction products other than those used in the original state). The work is necessary in order to achieve adequate flood safety. The project will be in line with the concept of universal design – the project will not create new infrastructure. The implementation of tasks has a significant impact on directing public tourism and recreational traffic in areas of valuable nature and surrounding the reservoir, creating favourable conditions for society as a whole. Output indicators Number of refurbished equipment for flood protection purposes: 1 pcs. Result indicators Number of population benefiting from flood protection measures (CI20): 536 persons The area covered by flood protection: 10926,90 ha (English)
    7 July 2021
    0 references

    Identifiers

    RPLD.05.01.01-10-0003/19
    0 references