Q2699402 (Q2699402): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The scope of the project is to adapt the room at the sports club in Pigża in order to create a common room with reconstruction of the access road and parking. This action will be implemented in connection with the development of the Local Revitalisation Programme for the Municipality of Łubianka, which identifies the area of the village of Pigża as an area requiring revitalisation activities. The infrastructure project will allow for a number of...) |
||||||||||||||
Property / summary | |||||||||||||||
The scope of the project is to adapt the room at the sports club in Pigża in order to create a common room with reconstruction of the access road and parking. This action will be implemented in connection with the development of the Local Revitalisation Programme for the Municipality of Łubianka, which identifies the area of the village of Pigża as an area requiring revitalisation activities. The infrastructure project will allow for a number of soft actions that will have an impact on the socio-economic regeneration of the locality, which is the main objective of the action. As part of the infrastructure works, the following works are planned:- the cuffing of old internal plasters in the entire adapted facility,- the construction of new partition walls in accordance with the construction project,- the implementation of the plastering of walls and ceilings inside the building after the completion of plastering,- it is necessary to distribute a new electrical installation, including new lighting energy-efficient LED type and a new water and sewage system, – a new floor will be made in the whole building,- a thermal modernisation of the building will be carried out consisting of warming the walls and replacing the roof, which will have an impact on the cost of its maintenance and the achievement of environmental objectives,- the window and door joinery will be replaced,- modern heating of the electric type will be made,- the equipment necessary for the operation of a common room such as tables, chairs, hangers, etc. will be purchased – the reconstruction of the access road together with the parking lot will be carried out. The entire building will be fully adapted to the needs of people with disabilities. During the adaptation works, architectural barriers will be removed, parking for people with disabilities will be made and the toilet will be adapted to the needs of people with disabilities. (English) | |||||||||||||||
Property / summary: The scope of the project is to adapt the room at the sports club in Pigża in order to create a common room with reconstruction of the access road and parking. This action will be implemented in connection with the development of the Local Revitalisation Programme for the Municipality of Łubianka, which identifies the area of the village of Pigża as an area requiring revitalisation activities. The infrastructure project will allow for a number of soft actions that will have an impact on the socio-economic regeneration of the locality, which is the main objective of the action. As part of the infrastructure works, the following works are planned:- the cuffing of old internal plasters in the entire adapted facility,- the construction of new partition walls in accordance with the construction project,- the implementation of the plastering of walls and ceilings inside the building after the completion of plastering,- it is necessary to distribute a new electrical installation, including new lighting energy-efficient LED type and a new water and sewage system, – a new floor will be made in the whole building,- a thermal modernisation of the building will be carried out consisting of warming the walls and replacing the roof, which will have an impact on the cost of its maintenance and the achievement of environmental objectives,- the window and door joinery will be replaced,- modern heating of the electric type will be made,- the equipment necessary for the operation of a common room such as tables, chairs, hangers, etc. will be purchased – the reconstruction of the access road together with the parking lot will be carried out. The entire building will be fully adapted to the needs of people with disabilities. During the adaptation works, architectural barriers will be removed, parking for people with disabilities will be made and the toilet will be adapted to the needs of people with disabilities. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The scope of the project is to adapt the room at the sports club in Pigża in order to create a common room with reconstruction of the access road and parking. This action will be implemented in connection with the development of the Local Revitalisation Programme for the Municipality of Łubianka, which identifies the area of the village of Pigża as an area requiring revitalisation activities. The infrastructure project will allow for a number of soft actions that will have an impact on the socio-economic regeneration of the locality, which is the main objective of the action. As part of the infrastructure works, the following works are planned:- the cuffing of old internal plasters in the entire adapted facility,- the construction of new partition walls in accordance with the construction project,- the implementation of the plastering of walls and ceilings inside the building after the completion of plastering,- it is necessary to distribute a new electrical installation, including new lighting energy-efficient LED type and a new water and sewage system, – a new floor will be made in the whole building,- a thermal modernisation of the building will be carried out consisting of warming the walls and replacing the roof, which will have an impact on the cost of its maintenance and the achievement of environmental objectives,- the window and door joinery will be replaced,- modern heating of the electric type will be made,- the equipment necessary for the operation of a common room such as tables, chairs, hangers, etc. will be purchased – the reconstruction of the access road together with the parking lot will be carried out. The entire building will be fully adapted to the needs of people with disabilities. During the adaptation works, architectural barriers will be removed, parking for people with disabilities will be made and the toilet will be adapted to the needs of people with disabilities. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 17:24, 7 July 2021
Project Q2699402 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2699402 in Poland |
Statements
275,305.13 zloty
0 references
386,956.2 zloty
0 references
71.15 percent
0 references
27 April 2018
0 references
31 December 2018
0 references
GMINA ŁUBIANKA
0 references
Zakresem przedmiotowego projektu jest zaadaptowanie pomieszczenia przy klubie sportowym w Pigży w celu utworzenia świetlicy wraz z przebudową drogi dojazdowej i parkingiem. Działanie te realizowane będzie w związku z opracowaniem Lokalnego Programu Rewitalizacji dla Gminy Łubianka, który wskazuje obszar miejscowości Pigża jak obszar wymagający działań rewitalizacyjnych. Projekt infrastrukturalny pozwoli na realizację szeregu działań o charakterze "miękkim", które będą miały wpływ na rewitalizację społeczno - gospodarczą miejscowości co jest celem głównym działania. W ramach prac infrastrukturalnych zaplanowano następujące prace:- skucie starych tynków wewnętrznych w całym adaptowanym obiekcie,- wykonanie nowych ścian działowych zgodnie z projektem budowlanym,- wykonanie ponownego otynkowania wewnątrz budynku,- po zakończeniu tynkowania wykonanie malowania ścian i sufitów wewnątrz obiektu,- niezbędne do wykonania jest rozprowadzenie nowej instalacji elektrycznej w tym również nowego oświetlenia energooszczędnego typu LED oraz nowej instalacji wodno - kanalizacyjnej,- wykonana zostanie nowa podłoga w całym obiekcie,- przeprowadzona zostanie termomodernizacja budynku polegająca na dociepleniu ścian oraz wymianie dachu, która będzie miała wpływ na koszty jego utrzymania oraz realizację celów środowiskowych,- wymieniona zostanie stolarka okienna i drzwiowa,- wykonane zostanie nowoczesne ogrzewanie typu elektrycznego,- zakupione zostanie wyposażenie niezbędne do funkcjonowania świetlicy typu stoły, krzesła, wieszaki itp.- wykonana zostanie przebudowa drogi dojazdowej wraz z parkingiem.Cały budynek będzie w pełni przystosowany do potrzeb osób niepełnosprawnych. W czasie prac adaptacyjnych zlikwidowane zostaną bariery architektoniczne, wykonany zostanie parking dla osób niepełnosprawnych jak również toaleta zostanie dostosowana do potrzeb osób niepełnosprawnych. (Polish)
0 references
The scope of the project is to adapt the room at the sports club in Pigża in order to create a common room with reconstruction of the access road and parking. This action will be implemented in connection with the development of the Local Revitalisation Programme for the Municipality of Łubianka, which identifies the area of the village of Pigża as an area requiring revitalisation activities. The infrastructure project will allow for a number of soft actions that will have an impact on the socio-economic regeneration of the locality, which is the main objective of the action. As part of the infrastructure works, the following works are planned:- the cuffing of old internal plasters in the entire adapted facility,- the construction of new partition walls in accordance with the construction project,- the implementation of the plastering of walls and ceilings inside the building after the completion of plastering,- it is necessary to distribute a new electrical installation, including new lighting energy-efficient LED type and a new water and sewage system, – a new floor will be made in the whole building,- a thermal modernisation of the building will be carried out consisting of warming the walls and replacing the roof, which will have an impact on the cost of its maintenance and the achievement of environmental objectives,- the window and door joinery will be replaced,- modern heating of the electric type will be made,- the equipment necessary for the operation of a common room such as tables, chairs, hangers, etc. will be purchased – the reconstruction of the access road together with the parking lot will be carried out. The entire building will be fully adapted to the needs of people with disabilities. During the adaptation works, architectural barriers will be removed, parking for people with disabilities will be made and the toilet will be adapted to the needs of people with disabilities. (English)
7 July 2021
0 references
Identifiers
RPKP.07.01.00-04-0013/18
0 references