Q2693192 (Q2693192): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The project fits into action 1.1 of the POPC Public Internet for everyone and aims to design and build 15 public hotspots with a capacity of min. 30 mb/s each. The place of implementation is the municipality of Ujazd in Opolskie voivodeship. The points will be set up in the following public places: Adam Mickiewicz Sp. z o.o. in Ujazd: 6 pcs, SP in Jaryszów: 2 pcs., Brania SP in Jaryszów with its registered office in Sieroniowice: 2 pcs., Tadeusz...) |
||||||||||||||
Property / summary | |||||||||||||||
The project fits into action 1.1 of the POPC Public Internet for everyone and aims to design and build 15 public hotspots with a capacity of min. 30 mb/s each. The place of implementation is the municipality of Ujazd in Opolskie voivodeship. The points will be set up in the following public places: Adam Mickiewicz Sp. z o.o. in Ujazd: 6 pcs, SP in Jaryszów: 2 pcs., Brania SP in Jaryszów with its registered office in Sieroniowice: 2 pcs., Tadeusz Kościuszko SP in Olszowa: 3 pcs., Brania SP in Olszowa with its registered office in Zimna Wódka: 2 pcs. A total of 15 internal hotspots. All points will be publicly available and access to the Internet will be possible under the terms and conditions set out in the Terms of Use. The rules of procedure will be drawn up in accordance with the rules of operation 1.1 of the POPC. The beneficiary shall provide the following options for each access point: support for the concurrent use of two bands (2.4 GHz – 5 GHz), a support cycle over 5 years, an average time between failures (MTBF) of at least 5 years, having a special and centralised single management point for all access points within each network Public Internet for each, IEEE 802.1x support, IEEE 802.11ac Wave I compliant, IEEE 802.11r support, IEEE 802.11k support, IEEE 802.11v support, ability to handle at least 50 users simultaneously without degradation, having at least 2x2 transmitters and receivers (multi-antenna MIMO system), compatibility with Hotspot 2.0 (Wi-Fi Alliance Passpoint Certification Program) and configuration and two-phase authorisation system in accordance with Annex 6 to the POPC 1.1 Rules. Confirmation of registration in RJST UKE will be provided before the signature of the grant agreement. (English) | |||||||||||||||
Property / summary: The project fits into action 1.1 of the POPC Public Internet for everyone and aims to design and build 15 public hotspots with a capacity of min. 30 mb/s each. The place of implementation is the municipality of Ujazd in Opolskie voivodeship. The points will be set up in the following public places: Adam Mickiewicz Sp. z o.o. in Ujazd: 6 pcs, SP in Jaryszów: 2 pcs., Brania SP in Jaryszów with its registered office in Sieroniowice: 2 pcs., Tadeusz Kościuszko SP in Olszowa: 3 pcs., Brania SP in Olszowa with its registered office in Zimna Wódka: 2 pcs. A total of 15 internal hotspots. All points will be publicly available and access to the Internet will be possible under the terms and conditions set out in the Terms of Use. The rules of procedure will be drawn up in accordance with the rules of operation 1.1 of the POPC. The beneficiary shall provide the following options for each access point: support for the concurrent use of two bands (2.4 GHz – 5 GHz), a support cycle over 5 years, an average time between failures (MTBF) of at least 5 years, having a special and centralised single management point for all access points within each network Public Internet for each, IEEE 802.1x support, IEEE 802.11ac Wave I compliant, IEEE 802.11r support, IEEE 802.11k support, IEEE 802.11v support, ability to handle at least 50 users simultaneously without degradation, having at least 2x2 transmitters and receivers (multi-antenna MIMO system), compatibility with Hotspot 2.0 (Wi-Fi Alliance Passpoint Certification Program) and configuration and two-phase authorisation system in accordance with Annex 6 to the POPC 1.1 Rules. Confirmation of registration in RJST UKE will be provided before the signature of the grant agreement. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project fits into action 1.1 of the POPC Public Internet for everyone and aims to design and build 15 public hotspots with a capacity of min. 30 mb/s each. The place of implementation is the municipality of Ujazd in Opolskie voivodeship. The points will be set up in the following public places: Adam Mickiewicz Sp. z o.o. in Ujazd: 6 pcs, SP in Jaryszów: 2 pcs., Brania SP in Jaryszów with its registered office in Sieroniowice: 2 pcs., Tadeusz Kościuszko SP in Olszowa: 3 pcs., Brania SP in Olszowa with its registered office in Zimna Wódka: 2 pcs. A total of 15 internal hotspots. All points will be publicly available and access to the Internet will be possible under the terms and conditions set out in the Terms of Use. The rules of procedure will be drawn up in accordance with the rules of operation 1.1 of the POPC. The beneficiary shall provide the following options for each access point: support for the concurrent use of two bands (2.4 GHz – 5 GHz), a support cycle over 5 years, an average time between failures (MTBF) of at least 5 years, having a special and centralised single management point for all access points within each network Public Internet for each, IEEE 802.1x support, IEEE 802.11ac Wave I compliant, IEEE 802.11r support, IEEE 802.11k support, IEEE 802.11v support, ability to handle at least 50 users simultaneously without degradation, having at least 2x2 transmitters and receivers (multi-antenna MIMO system), compatibility with Hotspot 2.0 (Wi-Fi Alliance Passpoint Certification Program) and configuration and two-phase authorisation system in accordance with Annex 6 to the POPC 1.1 Rules. Confirmation of registration in RJST UKE will be provided before the signature of the grant agreement. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 14:58, 7 July 2021
Project Q2693192 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2693192 in Poland |
Statements
54,712.8 zloty
0 references
64,368.0 zloty
0 references
85.0 percent
0 references
30 June 2020
0 references
31 March 2022
0 references
GMINA UJAZD
0 references
Projekt wpisuje się w działanie 1.1 POPC Publiczny internet dla każdego i ma na celu zaprojektowanie i wykonanie 15 publicznych hotspotów o przepływności min. 30 mb/s każdy. Miejsce realizacji to gmina Ujazd w woj. opolskim. Punkty zostaną utworzone w następujących miejscach publicznych: SP im. Adama Mickiewicza w Ujeździe: 6 szt., SP w Jaryszowie: 2 szt., Filia SP w Jaryszowie z siedzibą w Sieroniowicach: 2 szt., SP im. Tadeusza Kościuszki w Olszowej: 3 szt., Filia SP w Olszowej z siedzibą w Zimnej Wódce: 2 szt. Razem 15 wewnętrznych hotspotów. Wszystkie punkty będą publicznie dostępne, a dostęp do Internetu będzie możliwy na zasadach określonych w Regulaminie użytkowania. Regulamin zostanie sporządzony zgodnie z zasadami działania 1.1 POPC. Beneficjent zapewni następujące możliwości w przypadku każdego punku dostępu: obsługa współbieżnego wykorzystania dwóch pasm (2,4 GHz – 5 GHz), cykl wsparcia powyżej 5 lat, średni czas pomiędzy awariami (MTBF) wynoszący co najmniej 5 lat, posiadanie specjalnego i scentralizowanego pojedynczego punktu zarządzania dla wszystkich punktów dostępu w ramach każdej sieci Publiczny internet dla każdego, obsługa IEEE 802.1x, zgodność ze standardem IEEE 802.11ac Wave I, obsługa IEEE 802.11r, obsługa IEEE 802.11k, obsługa IEEE 802.11v, możliwość obsługi co najmniej 50 użytkowników jednocześnie bez pogorszenia funkcjonowania, posiadanie co najmniej 2x2 nadajników i odbiorników (system wieloantenowy MIMO), zgodność z programem Hotspot 2.0 (program certyfikacji Passpoint organizacji Wi-Fi Alliance) oraz konfigurację i dwufazowy system autoryzacji zgodne z załącznikiem nr 6 do Regulaminu konkursu POPC 1.1. Potwierdzenie wpisu do RJST UKE zostanie dostarczone przed podpisaniem umowy o dofinansowanie. (Polish)
0 references
The project fits into action 1.1 of the POPC Public Internet for everyone and aims to design and build 15 public hotspots with a capacity of min. 30 mb/s each. The place of implementation is the municipality of Ujazd in Opolskie voivodeship. The points will be set up in the following public places: Adam Mickiewicz Sp. z o.o. in Ujazd: 6 pcs, SP in Jaryszów: 2 pcs., Brania SP in Jaryszów with its registered office in Sieroniowice: 2 pcs., Tadeusz Kościuszko SP in Olszowa: 3 pcs., Brania SP in Olszowa with its registered office in Zimna Wódka: 2 pcs. A total of 15 internal hotspots. All points will be publicly available and access to the Internet will be possible under the terms and conditions set out in the Terms of Use. The rules of procedure will be drawn up in accordance with the rules of operation 1.1 of the POPC. The beneficiary shall provide the following options for each access point: support for the concurrent use of two bands (2.4 GHz – 5 GHz), a support cycle over 5 years, an average time between failures (MTBF) of at least 5 years, having a special and centralised single management point for all access points within each network Public Internet for each, IEEE 802.1x support, IEEE 802.11ac Wave I compliant, IEEE 802.11r support, IEEE 802.11k support, IEEE 802.11v support, ability to handle at least 50 users simultaneously without degradation, having at least 2x2 transmitters and receivers (multi-antenna MIMO system), compatibility with Hotspot 2.0 (Wi-Fi Alliance Passpoint Certification Program) and configuration and two-phase authorisation system in accordance with Annex 6 to the POPC 1.1 Rules. Confirmation of registration in RJST UKE will be provided before the signature of the grant agreement. (English)
7 July 2021
0 references
Identifiers
POPC.01.01.00-16-0078/19
0 references