Q2693051 (Q2693051): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project “Construction of GPZ Pilzno station with power line” consists of the construction of the 110/15 kV GPZ Pilzno power station with 110 kV switchgear and the construction of a 110 kV power line for GPZ Pilzno. Its scope includes: 1) Construction of 110/15 kV power station, equipped with 110 kV switchgear, constituting a structure with installations ensuring the possibility of using the object. 2) Introduction of two 110 kV lines: direct...)
Property / summary
 
The project “Construction of GPZ Pilzno station with power line” consists of the construction of the 110/15 kV GPZ Pilzno power station with 110 kV switchgear and the construction of a 110 kV power line for GPZ Pilzno. Its scope includes: 1) Construction of 110/15 kV power station, equipped with 110 kV switchgear, constituting a structure with installations ensuring the possibility of using the object. 2) Introduction of two 110 kV lines: direction Latoszyn and Nice. 3) Reconstruction of SN power lines. 4) Construction of land-based sanitary sewerage system. 5) Construction of sanitary sewerage connection. 6) Construction of an off-road rainwater sewer system. 7) Construction of a water supply connection. (English)
Property / summary: The project “Construction of GPZ Pilzno station with power line” consists of the construction of the 110/15 kV GPZ Pilzno power station with 110 kV switchgear and the construction of a 110 kV power line for GPZ Pilzno. Its scope includes: 1) Construction of 110/15 kV power station, equipped with 110 kV switchgear, constituting a structure with installations ensuring the possibility of using the object. 2) Introduction of two 110 kV lines: direction Latoszyn and Nice. 3) Reconstruction of SN power lines. 4) Construction of land-based sanitary sewerage system. 5) Construction of sanitary sewerage connection. 6) Construction of an off-road rainwater sewer system. 7) Construction of a water supply connection. (English) / rank
 
Normal rank
Property / summary: The project “Construction of GPZ Pilzno station with power line” consists of the construction of the 110/15 kV GPZ Pilzno power station with 110 kV switchgear and the construction of a 110 kV power line for GPZ Pilzno. Its scope includes: 1) Construction of 110/15 kV power station, equipped with 110 kV switchgear, constituting a structure with installations ensuring the possibility of using the object. 2) Introduction of two 110 kV lines: direction Latoszyn and Nice. 3) Reconstruction of SN power lines. 4) Construction of land-based sanitary sewerage system. 5) Construction of sanitary sewerage connection. 6) Construction of an off-road rainwater sewer system. 7) Construction of a water supply connection. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:57, 7 July 2021

Project Q2693051 in Poland
Language Label Description Also known as
English
No label defined
Project Q2693051 in Poland

    Statements

    0 references
    20,740,000.0 zloty
    0 references
    4,610,502.0 Euro
    0.2223 Euro
    0 references
    24,400,000.0 zloty
    0 references
    5,424,120.0 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    19 December 2019
    0 references
    31 December 2022
    0 references
    TAURON DYSTRYBUCJA S.A.
    0 references
    0 references

    49°58'43.0"N, 21°17'26.9"E
    0 references
    Projekt „Budowa stacji GPZ Pilzno wraz z linią zasilającą” polega na budowie stacji elektroenergetycznej 110/15 kV GPZ Pilzno z rozdzielnią 110 kV oraz budowie linii 110 kV zasilającej GPZ Pilzno. Jego zakres obejmuje: 1) Budowę stacji elektroenergetycznej 110/15 kV, wyposażonej w rozdzielnię 110 kV, stanowiącą budowlę wraz z instalacjami zapewniającymi możliwość użytkowania obiektu. 2) Wprowadzenie dwóch linii 110 kV: kierunek Latoszyn i Ładna. 3) Przebudowę linii elektroenergetycznych SN. 4) Budowę terenowej instalacji kanalizacji sanitarnej. 5) Budowę przyłącza kanalizacji sanitarnej. 6) Budowę terenowej instalacji kanalizacji deszczowej. 7) Budowę przyłącza wodociągowego. (Polish)
    0 references
    The project “Construction of GPZ Pilzno station with power line” consists of the construction of the 110/15 kV GPZ Pilzno power station with 110 kV switchgear and the construction of a 110 kV power line for GPZ Pilzno. Its scope includes: 1) Construction of 110/15 kV power station, equipped with 110 kV switchgear, constituting a structure with installations ensuring the possibility of using the object. 2) Introduction of two 110 kV lines: direction Latoszyn and Nice. 3) Reconstruction of SN power lines. 4) Construction of land-based sanitary sewerage system. 5) Construction of sanitary sewerage connection. 6) Construction of an off-road rainwater sewer system. 7) Construction of a water supply connection. (English)
    7 July 2021
    0 references

    Identifiers

    POIS.07.01.00-00-0007/19
    0 references