Construction of the Niemodlin bypass within dk 46 (Q2693027): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project consists of the construction of the Niemodlina ring road along national road No 46 with the parameters of the PG class road with a length of 11.49 km, carried out in the design and construction mode., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Construction of the Niemodlin bypass within dk 46

Revision as of 14:56, 7 July 2021

Project Q2693027 in Poland
Language Label Description Also known as
English
Construction of the Niemodlin bypass within dk 46
Project Q2693027 in Poland

    Statements

    0 references
    0 references
    241,571,834.11 zloty
    0 references
    53,701,418.72 Euro
    0.2223 Euro
    0 references
    284,202,157.79 zloty
    0 references
    63,178,139.68 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2022
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references

    50°53'30.8"N, 17°55'55.6"E
    0 references
    Przedsięwzięcie polega na budowie obwodnicy Niemodlina w ciągu drogi krajowej nr 46 o parametrach drogi klasy GP o długości 11,49 km, realizowanej w trybie projektuj i buduj. (Polish)
    0 references
    The project consists of the construction of the Niemodlina ring road along national road No 46 with the parameters of the PG class road with a length of 11.49 km, carried out in the design and construction mode. (English)
    7 July 2021
    0 references

    Identifiers

    POIS.04.02.00-00-0056/20
    0 references