Q2882070 (Q2882070): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The application refers to the Basic School D. António da Costa, which is a basic educational establishment with capacity for 50 maltas, attended by a total of 1,017 students With regard to the area covered by the operation, this school will have 2,620 m² of interventional/replaced fibrocement coverage, which means 5.2 % of the total area of the 15 schools that will have intervention., translated_summary)
Property / summary
 
The application refers to the Basic School D. António da Costa, which is a basic educational establishment with capacity for 50 maltas, attended by a total of 1,017 students With regard to the area covered by the operation, this school will have 2,620 m² of interventional/replaced fibrocement coverage, which means 5.2 % of the total area of the 15 schools that will have intervention. (English)
Property / summary: The application refers to the Basic School D. António da Costa, which is a basic educational establishment with capacity for 50 maltas, attended by a total of 1,017 students With regard to the area covered by the operation, this school will have 2,620 m² of interventional/replaced fibrocement coverage, which means 5.2 % of the total area of the 15 schools that will have intervention. (English) / rank
 
Normal rank
Property / summary: The application refers to the Basic School D. António da Costa, which is a basic educational establishment with capacity for 50 maltas, attended by a total of 1,017 students With regard to the area covered by the operation, this school will have 2,620 m² of interventional/replaced fibrocement coverage, which means 5.2 % of the total area of the 15 schools that will have intervention. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:49, 7 July 2021

Project Q2882070 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2882070 in Portugal

    Statements

    0 references
    187,330.0 Euro
    0 references
    50.0 percent
    0 references
    1 January 2021
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE ALMADA
    0 references

    38°40'43.72"N, 9°9'37.66"W
    0 references
    A candidatura é referente à Escola Básica D. António da Costa que é um estabelecimento de ensino básico com capacidade para 50 turmas, frequentado por um total de 1.017 alunos No que concerne a área abrangida pela operação, esta escola irá ter 2.620 m2 de cobertura de fibrocimento intervencionada/substituída e que significa 5,2 % da área total das 15 escolas que irão ter intervenção. (Portuguese)
    0 references
    The application refers to the Basic School D. António da Costa, which is a basic educational establishment with capacity for 50 maltas, attended by a total of 1,017 students With regard to the area covered by the operation, this school will have 2,620 m² of interventional/replaced fibrocement coverage, which means 5.2 % of the total area of the 15 schools that will have intervention. (English)
    7 July 2021
    0 references
    Almada, União das freguesias de Almada, Cova da Piedade, Pragal e Cacilhas
    0 references

    Identifiers

    LISBOA-07-5673-FEDER-000200
    0 references