Q2881962 (Q2881962): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): With this operation it is intended to equip the building of School No. 9 Barreiro with a new roof, rebuilding it with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the coverage rate of the requalification of primary schools in the Union of Freguesias of Alto Seixalinho, Santo André and Verderena., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
With this operation it is intended to equip the building of School No. 9 Barreiro with a new roof, rebuilding it with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the coverage rate of the requalification of primary schools in the Union of Freguesias of Alto Seixalinho, Santo André and Verderena. (English) | |||||||||||||||
Property / summary: With this operation it is intended to equip the building of School No. 9 Barreiro with a new roof, rebuilding it with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the coverage rate of the requalification of primary schools in the Union of Freguesias of Alto Seixalinho, Santo André and Verderena. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: With this operation it is intended to equip the building of School No. 9 Barreiro with a new roof, rebuilding it with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the coverage rate of the requalification of primary schools in the Union of Freguesias of Alto Seixalinho, Santo André and Verderena. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 11:39, 7 July 2021
Project Q2881962 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2881962 in Portugal |
Statements
97,824.4 Euro
0 references
50.0 percent
0 references
1 June 2020
0 references
31 December 2020
0 references
MUNICÍPIO DO BARREIRO
0 references
Com esta operação pretende-se dotar o edifício da Escola nº 9 do Barreiro com uma nova cobertura, reconstruindo-a com novos materiais que promovam ao edificado, um maior conforto térmico e melhores condições de estanquidade, contribuindo deste modo, para o aumento da taxa de cobertura da requalificação das escolas do ensino básico na União de Freguesias de Alto Seixalinho, Santo André e Verderena. (Portuguese)
0 references
With this operation it is intended to equip the building of School No. 9 Barreiro with a new roof, rebuilding it with new materials that promote the building, greater thermal comfort and better watertight conditions, thus contributing to the increase of the coverage rate of the requalification of primary schools in the Union of Freguesias of Alto Seixalinho, Santo André and Verderena. (English)
7 July 2021
0 references
Barreiro, União das freguesias de Alto do Seixalinho, Santo André e Verderena
0 references
Identifiers
LISBOA-07-5673-FEDER-000092
0 references