Q2880635 (Q2880635): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): Energy efficiency measures include optimising the thermal performance of the roof and glazed spans, intervention in the lighting system, replacement of UTAN and heat pumps, and installation of solar photovoltaic system. The overall reduction in energy consumption is 45.4 %, the overall reduction in CO2 emissions is 45.4 %. The energy efficiency class of the building before intervention is the C and after intervention it will be the B., translate...)
Property / summary
 
Energy efficiency measures include optimising the thermal performance of the roof and glazed spans, intervention in the lighting system, replacement of UTAN and heat pumps, and installation of solar photovoltaic system. The overall reduction in energy consumption is 45.4 %, the overall reduction in CO2 emissions is 45.4 %. The energy efficiency class of the building before intervention is the C and after intervention it will be the B. (English)
Property / summary: Energy efficiency measures include optimising the thermal performance of the roof and glazed spans, intervention in the lighting system, replacement of UTAN and heat pumps, and installation of solar photovoltaic system. The overall reduction in energy consumption is 45.4 %, the overall reduction in CO2 emissions is 45.4 %. The energy efficiency class of the building before intervention is the C and after intervention it will be the B. (English) / rank
 
Normal rank
Property / summary: Energy efficiency measures include optimising the thermal performance of the roof and glazed spans, intervention in the lighting system, replacement of UTAN and heat pumps, and installation of solar photovoltaic system. The overall reduction in energy consumption is 45.4 %, the overall reduction in CO2 emissions is 45.4 %. The energy efficiency class of the building before intervention is the C and after intervention it will be the B. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:56, 7 July 2021

Project Q2880635 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2880635 in Portugal

    Statements

    0 references
    76,619.32 Euro
    0 references
    50.0 percent
    0 references
    1 July 2020
    0 references
    31 December 2022
    0 references
    MUNICIPIO DE LISBOA
    0 references

    38°46'16.79"N, 9°9'49.57"W
    0 references
    As medidas de eficiência energética incluem a otimização do desempenho térmico da cobertura e dos vãos envidraçados, intervenção no sistema de iluminação, substituição das UTAN e das bombas de calor, e instalação de sistema solar fotovoltaico. A redução global do consumo da energia é de 45,4%, A redução global das emissões de CO2 é de 45,4%. A classe de eficiência energética do edifício antes de intervenção é o C e após intervenção será o B. (Portuguese)
    0 references
    Energy efficiency measures include optimising the thermal performance of the roof and glazed spans, intervention in the lighting system, replacement of UTAN and heat pumps, and installation of solar photovoltaic system. The overall reduction in energy consumption is 45.4 %, the overall reduction in CO2 emissions is 45.4 %. The energy efficiency class of the building before intervention is the C and after intervention it will be the B. (English)
    7 July 2021
    0 references
    Lisboa, Lumiar
    0 references

    Identifiers

    LISBOA-03-1203-FEDER-000109
    0 references