Q2877375 (Q2877375): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): In view of the results determined by the energy audit at the Penela Municipal Pool, it is considered essential to implement measures to reduce final energy consumption, which should focus on the building’s surroundings, the optimisation of technical systems and the implementation of renewable energy systems., translated_summary)
Property / summary
 
In view of the results determined by the energy audit at the Penela Municipal Pool, it is considered essential to implement measures to reduce final energy consumption, which should focus on the building’s surroundings, the optimisation of technical systems and the implementation of renewable energy systems. (English)
Property / summary: In view of the results determined by the energy audit at the Penela Municipal Pool, it is considered essential to implement measures to reduce final energy consumption, which should focus on the building’s surroundings, the optimisation of technical systems and the implementation of renewable energy systems. (English) / rank
 
Normal rank
Property / summary: In view of the results determined by the energy audit at the Penela Municipal Pool, it is considered essential to implement measures to reduce final energy consumption, which should focus on the building’s surroundings, the optimisation of technical systems and the implementation of renewable energy systems. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:37, 7 July 2021

Project Q2877375 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2877375 in Portugal

    Statements

    0 references
    215,195.51 Euro
    0 references
    85.0 percent
    0 references
    1 June 2018
    0 references
    31 December 2022
    0 references
    MUNICÍPIO DE PENELA
    0 references

    40°1'52.10"N, 8°23'24.72"W
    0 references
    Face aos resultados determinados pela auditoria energética à Piscina Municipal de Penela, considera-se essencial a implementação de medidas que permitam reduzir o consumo de energia final, as quais deverão incidir sobre a envolvente do edifício, a otimização dos sistemas técnicas e a implementação de sistemas com fonte de energia renovável. (Portuguese)
    0 references
    In view of the results determined by the energy audit at the Penela Municipal Pool, it is considered essential to implement measures to reduce final energy consumption, which should focus on the building’s surroundings, the optimisation of technical systems and the implementation of renewable energy systems. (English)
    7 July 2021
    0 references
    Penela, União das freguesias de São Miguel, Santa Eufémia e Rabaçal
    0 references

    Identifiers

    CENTRO-06-1203-FEDER-000114
    0 references