Rehabilitation of the Health Unit in Campo de Besteiros (Q2875609): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The operation is composed of a component, the Rehabilitation Enlargement of U Health of Besteiros Field. The intervention refers to the rehabilitation and expansion of the existing space, incorporating a pickup room, breastfeeding room and a diary room meeting/library room and expansion of the medical office. Rehabilitation provides intervention at the level of exterior and interior coatings, water and sewage, HVAC, electrical installations and...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Rehabilitation of the Health Unit in Campo de Besteiros

Revision as of 09:27, 7 July 2021

Project Q2875609 in Portugal
Language Label Description Also known as
English
Rehabilitation of the Health Unit in Campo de Besteiros
Project Q2875609 in Portugal

    Statements

    0 references
    160,369.64 Euro
    0 references
    85.0 percent
    0 references
    26 June 2019
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DE TONDELA
    0 references

    40°33'19.76"N, 8°8'2.76"W
    0 references
    A operação é composta por uma componente, a Reabilitação Ampliação da U Saúde de Campo de Besteiros. A intervenção refere-se á reabilitação e ampliação do espaço existente, incorporando uma sala de colheitas, sala de amamentação e fraldário sala de reuniões/biblioteca e ampliação de gabinete médico. A reabilitação prevê intervenção ao nível revestimentos exteriores e interiores, águas e esgotos, AVAC, Instalações elétricas e Risco de Incêndio (Portuguese)
    0 references
    The operation is composed of a component, the Rehabilitation Enlargement of U Health of Besteiros Field. The intervention refers to the rehabilitation and expansion of the existing space, incorporating a pickup room, breastfeeding room and a diary room meeting/library room and expansion of the medical office. Rehabilitation provides intervention at the level of exterior and interior coatings, water and sewage, HVAC, electrical installations and risk of fire (English)
    7 July 2021
    0 references
    Tondela, Campo de Besteiros
    0 references

    Identifiers

    CENTRO-05-4842-FEDER-000031
    0 references