Q2874370 (Q2874370): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): With the present operation,the promoter envisages the realisation of several investments in Herdade do Regato, in order to increase its productive capacity.The main objective of the project is to invest in the tourism aspect through the realisation of a leisure area and the acquisition of equipment and tools essential for the activity.At the ESF level, 2 employees are expected to be hired under the conditions laid down in Article 13 (3) of SI2E....)
Property / summary
 
With the present operation,the promoter envisages the realisation of several investments in Herdade do Regato, in order to increase its productive capacity.The main objective of the project is to invest in the tourism aspect through the realisation of a leisure area and the acquisition of equipment and tools essential for the activity.At the ESF level, 2 employees are expected to be hired under the conditions laid down in Article 13 (3) of SI2E. (English)
Property / summary: With the present operation,the promoter envisages the realisation of several investments in Herdade do Regato, in order to increase its productive capacity.The main objective of the project is to invest in the tourism aspect through the realisation of a leisure area and the acquisition of equipment and tools essential for the activity.At the ESF level, 2 employees are expected to be hired under the conditions laid down in Article 13 (3) of SI2E. (English) / rank
 
Normal rank
Property / summary: With the present operation,the promoter envisages the realisation of several investments in Herdade do Regato, in order to increase its productive capacity.The main objective of the project is to invest in the tourism aspect through the realisation of a leisure area and the acquisition of equipment and tools essential for the activity.At the ESF level, 2 employees are expected to be hired under the conditions laid down in Article 13 (3) of SI2E. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:07, 7 July 2021

Project Q2874370 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2874370 in Portugal

    Statements

    0 references
    89,958.65 Euro
    0 references
    85.0 percent
    0 references
    1 June 2018
    0 references
    29 February 2020
    0 references
    INVESTEL - INVESTIMENTOS HOTELEIROS LDA
    0 references

    39°49'35.87"N, 7°29'30.95"W
    0 references
    Com a presente operação,o promotor prevê a concretização de diversos investimentos na Herdade do Regato,com o intuito de aumentar a sua capacidade produtiva.O objetivo fundamental do projeto é apostar na vertente do turismo,através da concretização de uma área de lazer e na aquisição de equipamentos e ferramentas imprescindíveis à atividade.Ao nível do FSE,prevê-se a contratação de 2 colaboradores nas condições previstas no n.º3 do art13.ºdo SI2E (Portuguese)
    0 references
    With the present operation,the promoter envisages the realisation of several investments in Herdade do Regato, in order to increase its productive capacity.The main objective of the project is to invest in the tourism aspect through the realisation of a leisure area and the acquisition of equipment and tools essential for the activity.At the ESF level, 2 employees are expected to be hired under the conditions laid down in Article 13 (3) of SI2E. (English)
    7 July 2021
    0 references
    Castelo Branco, Castelo Branco
    0 references

    Identifiers

    CENTRO-04-3827-FEDER-001707
    0 references