Reduction of the energy intensity of production (Q15651): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): The purpose of the project is to reduce the operating costs of production, consisting of the insulation of selected objects, the use of waste heat by furnaces, reconstruction of the transformer., Adding English summary) |
||
Property / summary | |||
The purpose of the project is to reduce the operating costs of production, consisting of the insulation of selected objects, the use of waste heat by furnaces, reconstruction of the transformer. (English) | |||
Property / summary: The purpose of the project is to reduce the operating costs of production, consisting of the insulation of selected objects, the use of waste heat by furnaces, reconstruction of the transformer. (English) / rank | |||
Normal rank |
Revision as of 11:43, 25 February 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of the energy intensity of production |
Project in Czech Republic financed by DG Regio |
Statements
6,969,628.94 Czech koruna
0 references
23,232,096.48 Czech koruna
0 references
29.9999999827824 percent
0 references
24 November 2017
0 references
27 August 2018
0 references
Seco GROUP a.s.
0 references
19011
0 references
Předmětem projektu je snížení provozních nákladů na výrobu, spočívající v zateplení vybraných objektů, využití odpadního tepla pecí, rekonstrukce transformátorů. a. (Czech)
0 references
The purpose of the project is to reduce the operating costs of production, consisting of the insulation of selected objects, the use of waste heat by furnaces, reconstruction of the transformer. (English)
0 references
Identifiers
CZ.01.3.10/0.0/0.0/15_010/0002735
0 references