Northeastern School Center – Requalification and expansion of the school of the 1st CEB of Vila Maior (Q2870996): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The intervention includes the requalification and expansion of the school of the 1st cycle of Basic Education (former primary school) of Vila Maior, creating spaces for library, multipurpose space and refectory, teacher room and attendance. Equipping with school furniture, didactic and computer equipment. There will also be an intervention in the outside arrangements of the school., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Northeastern School Center – Requalification and expansion of the school of the 1st CEB of Vila Maior

Revision as of 02:15, 7 July 2021

Project Q2870996 in Portugal
Language Label Description Also known as
English
Northeastern School Center – Requalification and expansion of the school of the 1st CEB of Vila Maior
Project Q2870996 in Portugal

    Statements

    0 references
    297,049.72 Euro
    0 references
    85.0 percent
    0 references
    27 October 2016
    0 references
    18 August 2020
    0 references
    MUNICÍPIO DE SÃO PEDRO DO SUL
    0 references

    40°47'30.59"N, 8°2'2.36"W
    0 references
    A intervenção contempla a Requalificação e Ampliação da escola do 1.º ciclo do Ensino Básico (antiga escola primária) de Vila Maior, criando espaços para biblioteca, espaço polivalente e refeitório, sala de professores e atendimento. Apetrechamento com mobiliário escolar, material didático e informático. haverá ainda uma intervenção nos arranjos exteriores da escola. (Portuguese)
    0 references
    The intervention includes the requalification and expansion of the school of the 1st cycle of Basic Education (former primary school) of Vila Maior, creating spaces for library, multipurpose space and refectory, teacher room and attendance. Equipping with school furniture, didactic and computer equipment. There will also be an intervention in the outside arrangements of the school. (English)
    7 July 2021
    0 references
    São Pedro do Sul, Vila Maior
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000080
    0 references