Q2870959 (Q2870959): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The operation has a strong contribution to the achievement of the More and Better Education objective. The proposed intervention aims to eliminate provisional and adapted spaces for full-time school components. As well, the closure of small schools to enable the adequacy of the conditions of the schools to promote success. The intervention provides for the closure of EB Farms do Sirol., translated_summary)
Property / summary
 
The operation has a strong contribution to the achievement of the More and Better Education objective. The proposed intervention aims to eliminate provisional and adapted spaces for full-time school components. As well, the closure of small schools to enable the adequacy of the conditions of the schools to promote success. The intervention provides for the closure of EB Farms do Sirol. (English)
Property / summary: The operation has a strong contribution to the achievement of the More and Better Education objective. The proposed intervention aims to eliminate provisional and adapted spaces for full-time school components. As well, the closure of small schools to enable the adequacy of the conditions of the schools to promote success. The intervention provides for the closure of EB Farms do Sirol. (English) / rank
 
Normal rank
Property / summary: The operation has a strong contribution to the achievement of the More and Better Education objective. The proposed intervention aims to eliminate provisional and adapted spaces for full-time school components. As well, the closure of small schools to enable the adequacy of the conditions of the schools to promote success. The intervention provides for the closure of EB Farms do Sirol. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 02:14, 7 July 2021

Project Q2870959 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2870959 in Portugal

    Statements

    0 references
    367,697.42 Euro
    0 references
    85.0 percent
    0 references
    27 July 2016
    0 references
    14 November 2018
    0 references
    MUNICÍPIO DE LEIRIA
    0 references

    39°46'9.44"N, 8°44'56.15"W
    0 references
    A operação tem um forte contributo na concretização do objetivo “Mais e Melhor Educação”. A intervenção proposta visa eliminar espaços provisórios e adaptados para as componentes da “escola a tempo inteiro”. Bem como, o encerramento de escolas de pequena dimensão para possibilitar a adequação das condições das escolas à promoção do sucesso. A intervenção prevê o encerramento da EB de Quintas do Sirol.. (Portuguese)
    0 references
    The operation has a strong contribution to the achievement of the More and Better Education objective. The proposed intervention aims to eliminate provisional and adapted spaces for full-time school components. As well, the closure of small schools to enable the adequacy of the conditions of the schools to promote success. The intervention provides for the closure of EB Farms do Sirol. (English)
    7 July 2021
    0 references
    Leiria, União das freguesias de Santa Eufémia e Boa Vista
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000031
    0 references