Requalification of the coverage of the EB School 2.3 of Porto Alto (Q2862860): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Lezíria do Tejo Subregion / rank
 
Normal rank

Revision as of 20:42, 6 July 2021

Project Q2862860 in Portugal
Language Label Description Also known as
English
Requalification of the coverage of the EB School 2.3 of Porto Alto
Project Q2862860 in Portugal

    Statements

    0 references
    158,043.91 Euro
    0 references
    85.0 percent
    0 references
    2 October 2020
    0 references
    2 October 2021
    0 references
    MUNICÍPIO DE BENAVENTE
    0 references

    38°56'5.53"N, 8°52'8.36"W
    0 references
    A operação em apreço consiste na remoção e substituição da cobertura em fibrocimento do edifício da Escola EB 2,3 do Porto Alto. É constituída por duas componentes (elaboração do projeto técnico e execução da respetiva empreitada) e apresenta um investimento total no montante de 158.043,91EUR. A área total de intervenção é de 2.397,00 m2. (Portuguese)
    0 references
    The operation under consideration consists of removing and replacing the fibrocement cover of the EB School 2.3 building in Porto Alto. It consists of two components (development of the technical project and execution of the project) and has a total investment of EUR 158043,91. The total intervention area is 2397.00 m². (English)
    6 July 2021
    0 references
    Benavente, Samora Correia
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000133
    0 references