Pedestrian Public Access to the New Door of Treason (Q2863418): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Alentejo Central / rank | |||
Normal rank |
Revision as of 15:29, 6 July 2021
Project Q2863418 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Pedestrian Public Access to the New Door of Treason |
Project Q2863418 in Portugal |
Statements
47,903.83 Euro
0 references
85.0 percent
0 references
1 June 2017
0 references
30 December 2019
0 references
MUNICÍPIO DE ÉVORA
0 references
O Acesso pedonal à Porta da Traição está integrado no Projeto de Requalificação e Reabilitação do Espaço Público da Acrópole de Évora, que se articula com a intervenção no Pátio e Ermida de S. Miguel, promovendo o acesso pedonal. A intervenção consiste na construção de passeio lateral e escadaria ao longo da Rampa de S. Miguel e de um caminho em saibro a partir da Porta da Traição e sobre o afloramento rochoso e repavimentação da Rampa. (Portuguese)
0 references
The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repaviation of the Ramp. (English)
6 July 2021
0 references
Évora, União das freguesias de Évora (São Mamede, Sé, São Pedro e Santo Antão)
0 references
Identifiers
ALT20-04-2316-FEDER-000038
0 references