Construction of the river beach of Albufeira de Odeleite (Q2857658): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Algarve / rank | |||
Normal rank |
Revision as of 15:24, 6 July 2021
Project Q2857658 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the river beach of Albufeira de Odeleite |
Project Q2857658 in Portugal |
Statements
242,585.93 Euro
0 references
80.0 percent
0 references
6 June 2016
0 references
30 December 2021
0 references
MUNICÍPIO DE CASTRO MARIM
0 references
A proposta para a criação da Praia Fluvial da Albufeira de Odeleite consiste principalmente na requalificação dos acessos existentes e na criação de uma área recreio próximo da massa de água da albufeira, onde se pretendem criar as melhores condições de fruição deste espaço. A área destinada à praia fluvial será vedada pelo limite do complexo náutico/praia fluvial de Odeleite e terá acesso único a partir da via principal. (Portuguese)
0 references
The proposal for the creation of the River Beach of Albufeira de Odeleite consists mainly of the requalification of existing accesses and the creation of a recreational area close to the mass of water of the reservoir, where it is intended to create the best conditions of enjoyment of this space. The area intended for the river beach will be fenced by the boundary of the nautical complex/fluvial beach of Odeleite and will have unique access from the main road. (English)
6 July 2021
0 references
Castro Marim
0 references
Identifiers
ALG-04-2114-FEDER-000020
0 references