ENERGY EFFICIENCY IN THE POOL MUNICIPAL DE CASTRO MARIM (Q2857598): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Algarve / rank | |||
Normal rank |
Revision as of 15:24, 6 July 2021
Project Q2857598 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY EFFICIENCY IN THE POOL MUNICIPAL DE CASTRO MARIM |
Project Q2857598 in Portugal |
Statements
63,403.21 Euro
0 references
80.0 percent
0 references
1 January 2019
0 references
31 December 2021
0 references
MUNICÍPIO DE CASTRO MARIM
0 references
A operação aposta em medidas que conduzem a 1 diminuição de consumos energéticos no Edifício Piscinas Municipais de Castro Marim, através da substituição de equipamentos obsoletos por outros eficientes, utilização de sistemas solares (térmico) e colocação de isolamento térmico na cobertura. Pretende-se diminuir o impacto energético e carbónico, pela redução de emissões com efeito de estufa. (Portuguese)
0 references
The operation focuses on measures that lead to 1 reduction of energy consumption in the Municipal Pools Building of Castro Marim, through the replacement of obsolete equipment by other efficient ones, use of solar systems (thermal) and placement of thermal insulation in the roof. The aim is to reduce the energy and carbon impact by reducing greenhouse emissions. (English)
6 July 2021
0 references
Castro Marim
0 references
Identifiers
ALG-03-1203-FEDER-000025
0 references