Expansion and Rehabilitation of the EB/JI School of Miracles (Q2854621): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The present application aims to expand the EB/JI school of Miracles, in Ponta Delgada, which includes the construction of a new building composed of a single floor and connected to the existing one, thus allowing the movement and access all areas inside it and with various connections to the outside including that of people with mobility conditioned to the majority of the school space. The rehabilitation of the building is also integrated in the...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Expansion and Rehabilitation of the EB/JI School of Miracles

Revision as of 12:48, 6 July 2021

Project Q2854621 in Portugal
Language Label Description Also known as
English
Expansion and Rehabilitation of the EB/JI School of Miracles
Project Q2854621 in Portugal

    Statements

    0 references
    1,177,752.38 Euro
    0 references
    85.0 percent
    0 references
    12 May 2016
    0 references
    31 October 2019
    0 references
    MUNICIPIO DE PONTA DELGADA
    0 references
    A presente candidatura visa a ampliação de escola EB/JI dos Milagres, em Ponta Delgada, a qual comporta a construção de um edifício novo composto por um único piso e com ligação ao existente, permitindo assim a deslocação e acesso todas as áreas no interior do mesmo e com várias ligações ao exterior incluindo a de pessoas com mobilidade condicionada à maioria do espaço da Escola. Está ainda integrada na intervenção a reabilitação do edifício act (Portuguese)
    0 references
    The present application aims to expand the EB/JI school of Miracles, in Ponta Delgada, which includes the construction of a new building composed of a single floor and connected to the existing one, thus allowing the movement and access all areas inside it and with various connections to the outside including that of people with mobility conditioned to the majority of the school space. The rehabilitation of the building is also integrated in the intervention (English)
    6 July 2021
    0 references
    Ponta Delgada
    0 references

    Identifiers

    ACORES-10-5673-FEDER-000008
    0 references