Q2854022 (Q2854022): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The operation consists of the requalification of the E.R. between Arrebentão and the Sand Watch (São Lourenço) on the island of Santa Maria for a total length of 3,354 m, and in the coastal area of the Bay of São Lourenço (in a length of 1,029 m) the intervention only considers the vertical and horizontal signage.In addition to the requalification of the road, work to place vertical and horizontal signalling are planned throughout its extension...)
Property / summary
 
The operation consists of the requalification of the E.R. between Arrebentão and the Sand Watch (São Lourenço) on the island of Santa Maria for a total length of 3,354 m, and in the coastal area of the Bay of São Lourenço (in a length of 1,029 m) the intervention only considers the vertical and horizontal signage.In addition to the requalification of the road, work to place vertical and horizontal signalling are planned throughout its extension (since the requalification of the road). (English)
Property / summary: The operation consists of the requalification of the E.R. between Arrebentão and the Sand Watch (São Lourenço) on the island of Santa Maria for a total length of 3,354 m, and in the coastal area of the Bay of São Lourenço (in a length of 1,029 m) the intervention only considers the vertical and horizontal signage.In addition to the requalification of the road, work to place vertical and horizontal signalling are planned throughout its extension (since the requalification of the road). (English) / rank
 
Normal rank
Property / summary: The operation consists of the requalification of the E.R. between Arrebentão and the Sand Watch (São Lourenço) on the island of Santa Maria for a total length of 3,354 m, and in the coastal area of the Bay of São Lourenço (in a length of 1,029 m) the intervention only considers the vertical and horizontal signage.In addition to the requalification of the road, work to place vertical and horizontal signalling are planned throughout its extension (since the requalification of the road). (English) / qualifier
 
point in time: 6 July 2021
Timestamp+2021-07-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:43, 6 July 2021

Project Q2854022 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2854022 in Portugal

    Statements

    0 references
    531,852.51 Euro
    0 references
    85.0 percent
    0 references
    10 September 2014
    0 references
    7 May 2018
    0 references
    SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
    0 references
    A operação consiste na requalificação da E.R. entre o Arrebentão e a Vigia da Areia (São Lourenço) sito na ilha de Santa Maria numa extensão total de 3.354m, sendo que na zona litoral da Baía de São Lourenço (num comprimento de 1.029m) a intervenção apenas considera a sinalização vertical e horizontal.Para além da requalificação da estrada, estão previstos trabalhos de colocação de sinalização vertical e horizontal em toda a sua extensão (desde (Portuguese)
    0 references
    The operation consists of the requalification of the E.R. between Arrebentão and the Sand Watch (São Lourenço) on the island of Santa Maria for a total length of 3,354 m, and in the coastal area of the Bay of São Lourenço (in a length of 1,029 m) the intervention only considers the vertical and horizontal signage.In addition to the requalification of the road, work to place vertical and horizontal signalling are planned throughout its extension (since the requalification of the road). (English)
    6 July 2021
    0 references
    Vila do Porto
    0 references

    Identifiers

    ACORES-07-2756-FEDER-000004
    0 references