Rapid charging stations of the public electrical mobility network (Q2853731): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The Region presents the ideal conditions for the implementation of electrical mobility: On the one hand, the small size of our islands makes us overcome the problems associated with the autonomy of electric vehicles; on the other, we have endogenous and renewable resources, whose use for energy production can be optimised by the massification of electrical mobility.The Regional Directorate for Energy is the department of the Regional Government...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Rapid charging stations of the public electrical mobility network

Revision as of 12:40, 6 July 2021

Project Q2853731 in Portugal
Language Label Description Also known as
English
Rapid charging stations of the public electrical mobility network
Project Q2853731 in Portugal

    Statements

    0 references
    767,623.66 Euro
    0 references
    79.0 percent
    0 references
    1 January 2019
    0 references
    31 December 2020
    0 references
    DIREÇÃO REGIONAL DA ENERGIA
    0 references
    A Região apresenta as condições ideais para a implementação da mobilidade elétrica: por um lado, a reduzida dimensão das nossas ilhas faz-nos ultrapassar os problemas associados à autonomia dos veículos elétricos, por outro, possuímos recursos endógenos e renováveis, cuja utilização para produção de energia, poderá ser otimizada com a massificação da mobilidade elétrica.A Direção Regional da Energia é o departamento do Governo Regional dos Açor (Portuguese)
    0 references
    The Region presents the ideal conditions for the implementation of electrical mobility: On the one hand, the small size of our islands makes us overcome the problems associated with the autonomy of electric vehicles; on the other, we have endogenous and renewable resources, whose use for energy production can be optimised by the massification of electrical mobility.The Regional Directorate for Energy is the department of the Regional Government of Azor (English)
    6 July 2021
    0 references

    Identifiers

    ACORES-04-1406-FEDER-000010
    0 references