Q2853701 (Q2853701): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The project of renewable energy storage batteries for the island of Terceira balances the daily cycle of consumption with the production of renewable energies, allowing greater use of renewable energies, without waste of daily production does not affect distribution, taking into account consumption cycles. Technical and financial feasibility studies of the operation, as well as construction of infrastructure and acquisition are planned., transla...)
Property / summary
 
The project of renewable energy storage batteries for the island of Terceira balances the daily cycle of consumption with the production of renewable energies, allowing greater use of renewable energies, without waste of daily production does not affect distribution, taking into account consumption cycles. Technical and financial feasibility studies of the operation, as well as construction of infrastructure and acquisition are planned. (English)
Property / summary: The project of renewable energy storage batteries for the island of Terceira balances the daily cycle of consumption with the production of renewable energies, allowing greater use of renewable energies, without waste of daily production does not affect distribution, taking into account consumption cycles. Technical and financial feasibility studies of the operation, as well as construction of infrastructure and acquisition are planned. (English) / rank
 
Normal rank
Property / summary: The project of renewable energy storage batteries for the island of Terceira balances the daily cycle of consumption with the production of renewable energies, allowing greater use of renewable energies, without waste of daily production does not affect distribution, taking into account consumption cycles. Technical and financial feasibility studies of the operation, as well as construction of infrastructure and acquisition are planned. (English) / qualifier
 
point in time: 6 July 2021
Timestamp+2021-07-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:37, 6 July 2021

Project Q2853701 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2853701 in Portugal

    Statements

    0 references
    11,780,364.8 Euro
    0 references
    79.0 percent
    0 references
    18 December 2017
    0 references
    31 December 2021
    0 references
    EDA - ELECTRICIDADE DOS AÇORES, S.A.
    0 references
    O projeto de baterias de armazenagem de energias renováveis para a ilha Terceira vem equilibrar o ciclo diário do consumo, com a produção de energias renováveis, permitindo um maior aproveitamento das energias renováveis, sem haver desperdícios da produção diária não afeta à distribuição, tendo em conta os ciclos de consumo.Estão previstos estudos de viabilidade técnica e financeira da operação, bem como construção de infraestrutura e aquisição (Portuguese)
    0 references
    The project of renewable energy storage batteries for the island of Terceira balances the daily cycle of consumption with the production of renewable energies, allowing greater use of renewable energies, without waste of daily production does not affect distribution, taking into account consumption cycles. Technical and financial feasibility studies of the operation, as well as construction of infrastructure and acquisition are planned. (English)
    6 July 2021
    0 references
    Vila da Praia da Vitória
    0 references

    Identifiers

    ACORES-04-1001-FEDER-000001
    0 references