Q2769499 (Q2769499): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Greece)
(‎Created claim: summary (P836): The construction of a tourist boat anchorage in P.K. Vassiliki, D.E.Apolonia Lefkada, will be completed, which will include works to protect the anchorage, 100 berths, 4 buildings serving the anchorage and the configuration of the surrounding area.If a group of works is included in the second phase is: A. PORTABLE WORKS1. Port earthmoving 47.47 %2. Natural boulders 68,46 %3. Concrete 99.45 %4. Accessories Equipment 100,00 %5. Floating piers 100...)
Property / summary
 
The construction of a tourist boat anchorage in P.K. Vassiliki, D.E.Apolonia Lefkada, will be completed, which will include works to protect the anchorage, 100 berths, 4 buildings serving the anchorage and the configuration of the surrounding area.If a group of works is included in the second phase is: A. PORTABLE WORKS1. Port earthmoving 47.47 %2. Natural boulders 68,46 %3. Concrete 99.45 %4. Accessories Equipment 100,00 %5. Floating piers 100,00 %6. Roadblocks Insurance 100.00 %B. Buildings AND HOLDER Installations1. Earthmoving Destroyers 68,85 %2. Concrete 36.85 %3. Masonry coatings 100,00 %4. Networks (Hydraulic Electrics) 99,58 %5. Coatings 100,00 %6. Constructions Wooden Metal 100,00 %7. Other Finishes 92,85 % (English)
Property / summary: The construction of a tourist boat anchorage in P.K. Vassiliki, D.E.Apolonia Lefkada, will be completed, which will include works to protect the anchorage, 100 berths, 4 buildings serving the anchorage and the configuration of the surrounding area.If a group of works is included in the second phase is: A. PORTABLE WORKS1. Port earthmoving 47.47 %2. Natural boulders 68,46 %3. Concrete 99.45 %4. Accessories Equipment 100,00 %5. Floating piers 100,00 %6. Roadblocks Insurance 100.00 %B. Buildings AND HOLDER Installations1. Earthmoving Destroyers 68,85 %2. Concrete 36.85 %3. Masonry coatings 100,00 %4. Networks (Hydraulic Electrics) 99,58 %5. Coatings 100,00 %6. Constructions Wooden Metal 100,00 %7. Other Finishes 92,85 % (English) / rank
 
Normal rank
Property / summary: The construction of a tourist boat anchorage in P.K. Vassiliki, D.E.Apolonia Lefkada, will be completed, which will include works to protect the anchorage, 100 berths, 4 buildings serving the anchorage and the configuration of the surrounding area.If a group of works is included in the second phase is: A. PORTABLE WORKS1. Port earthmoving 47.47 %2. Natural boulders 68,46 %3. Concrete 99.45 %4. Accessories Equipment 100,00 %5. Floating piers 100,00 %6. Roadblocks Insurance 100.00 %B. Buildings AND HOLDER Installations1. Earthmoving Destroyers 68,85 %2. Concrete 36.85 %3. Masonry coatings 100,00 %4. Networks (Hydraulic Electrics) 99,58 %5. Coatings 100,00 %6. Constructions Wooden Metal 100,00 %7. Other Finishes 92,85 % (English) / qualifier
 
point in time: 2 July 2021
Timestamp+2021-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:53, 2 July 2021

Project Q2769499 in Greece
Language Label Description Also known as
English
No label defined
Project Q2769499 in Greece

    Statements

    0 references
    12,387,318.0 Euro
    0 references
    80.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    ΔΗΜΟΣ ΛΕΥΚΑΔΑΣ
    0 references

    38°13'51.92"N, 20°33'5.29"E
    0 references

    38°13'51.92"N, 20°33'5.29"E
    0 references
    Πρόκειται να ολοκληρωθεί η κατασκευή αγκυροβολίου τουριστικών σκαφών στην Τ.Κ. Βασιλικής, της Δ.Ε. Απολλωνίων Λευκάδας, το οποίο θα περιλαμβάνει έργα προστασίας του αγκυροβολίου, 100 θέσεις ελλιμενισμού, 4 κτίρια εξυπηρέτησης του αγκυροβολίου και διαμόρφωση του περιβάλλοντα χώρου.Ανά ομάδα εργασιών το ποσοστό που περιλαμβάνεται στην β΄φάση είναι: Α. ΛΙΜΕΝΙΚΑ ΕΡΓΑ1. Χωματουργικά Λιμενικών 47,47 %2. Λιθορριπές – Φυσικοί ογκόλιθοι 68,46 %3. Σκυροδέματα 99,45 %4. Εξαρτήματα – Εξοπλισμοί 100,00 %5. Πλωτοί προβλήτες 100,00 %6. Οδοστρωσία Ασφαλτικά 100,00 %Β. ΚΤΙΡΙΑΚΑ ΕΡΓΑ ΚΑΙ ΧΕΡΣΑΙΕΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ1. Χωματουργικά – Καθαιρέσεις 68,85 %2. Σκυροδέματα 36,85%3. Τοιχοποιΐες – Επιχρίσματα 100,00 %4. Δίκτυα (Υδραυλικά – Ηλεκτρικά) 99,58 %5. Επενδυσεις – Επιστρώσεις 100,00%6. Κατασκευές Ξύλινες – Μεταλλικές 100,00%7. Λοιπά – Τελειώματα 92,85 % (Greek)
    0 references
    The construction of a tourist boat anchorage in P.K. Vassiliki, D.E.Apolonia Lefkada, will be completed, which will include works to protect the anchorage, 100 berths, 4 buildings serving the anchorage and the configuration of the surrounding area.If a group of works is included in the second phase is: A. PORTABLE WORKS1. Port earthmoving 47.47 %2. Natural boulders 68,46 %3. Concrete 99.45 %4. Accessories Equipment 100,00 %5. Floating piers 100,00 %6. Roadblocks Insurance 100.00 %B. Buildings AND HOLDER Installations1. Earthmoving Destroyers 68,85 %2. Concrete 36.85 %3. Masonry coatings 100,00 %4. Networks (Hydraulic Electrics) 99,58 %5. Coatings 100,00 %6. Constructions Wooden Metal 100,00 %7. Other Finishes 92,85 % (English)
    2 July 2021
    0 references

    Identifiers

    5.003.754
    0 references