(Changed an Item: import item from Greece) |
(Created claim: summary (P836): The action is included in the approved Sustainable Urban Development Strategy of the city of Trikala and concerns interventions of aesthetics and environmental upgrading of the urban area of the city of Trikala. In particular, it includes:1. Interventions on Kapodistrian street with extension of the pavements and integration on the existing cycling track. The intervention, on the side of the cycling track, has a total width of 3.80 m. On the opp...) |
||||||||||||||
Property / summary | |||||||||||||||
The action is included in the approved Sustainable Urban Development Strategy of the city of Trikala and concerns interventions of aesthetics and environmental upgrading of the urban area of the city of Trikala. In particular, it includes:1. Interventions on Kapodistrian street with extension of the pavements and integration on the existing cycling track. The intervention, on the side of the cycling track, has a total width of 3.80 m. On the opposite sidewalk the coating material will be replaced with blocks 2. Interventions in the area of the Railway Station with modification of the existing level crossing of Eleftherias, Gate, Evripidou and Meteora streets and forming a roundabout and reshaping the entrance of the Railway Station by forming a roundabout at the intersection of Asklipiou, Evripidou and Kavrakos roads, including the formation of the pedestrians of the wider area. With own resources of the Municipality of Trikkaion P/Y EUR 59,250,00, replaces the existing asphalt and construction of pedestrian crossings on the Garibaldi road, as well as those on the streets of Byron and Apollo at their confluence with Garibaldi street, with grey granite cubicle and the necessary marking. (English) | |||||||||||||||
Property / summary: The action is included in the approved Sustainable Urban Development Strategy of the city of Trikala and concerns interventions of aesthetics and environmental upgrading of the urban area of the city of Trikala. In particular, it includes:1. Interventions on Kapodistrian street with extension of the pavements and integration on the existing cycling track. The intervention, on the side of the cycling track, has a total width of 3.80 m. On the opposite sidewalk the coating material will be replaced with blocks 2. Interventions in the area of the Railway Station with modification of the existing level crossing of Eleftherias, Gate, Evripidou and Meteora streets and forming a roundabout and reshaping the entrance of the Railway Station by forming a roundabout at the intersection of Asklipiou, Evripidou and Kavrakos roads, including the formation of the pedestrians of the wider area. With own resources of the Municipality of Trikkaion P/Y EUR 59,250,00, replaces the existing asphalt and construction of pedestrian crossings on the Garibaldi road, as well as those on the streets of Byron and Apollo at their confluence with Garibaldi street, with grey granite cubicle and the necessary marking. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The action is included in the approved Sustainable Urban Development Strategy of the city of Trikala and concerns interventions of aesthetics and environmental upgrading of the urban area of the city of Trikala. In particular, it includes:1. Interventions on Kapodistrian street with extension of the pavements and integration on the existing cycling track. The intervention, on the side of the cycling track, has a total width of 3.80 m. On the opposite sidewalk the coating material will be replaced with blocks 2. Interventions in the area of the Railway Station with modification of the existing level crossing of Eleftherias, Gate, Evripidou and Meteora streets and forming a roundabout and reshaping the entrance of the Railway Station by forming a roundabout at the intersection of Asklipiou, Evripidou and Kavrakos roads, including the formation of the pedestrians of the wider area. With own resources of the Municipality of Trikkaion P/Y EUR 59,250,00, replaces the existing asphalt and construction of pedestrian crossings on the Garibaldi road, as well as those on the streets of Byron and Apollo at their confluence with Garibaldi street, with grey granite cubicle and the necessary marking. (English) / qualifier | |||||||||||||||
point in time: 2 July 2021
|
Revision as of 13:39, 2 July 2021
Project Q2769312 in Greece
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2769312 in Greece |
Statements
1,230,200.0 Euro
0 references
80.0 percent
0 references
1 June 2021
0 references
31 December 2023
0 references
ΔΗΜΟΣ ΤΡΙΚΚΑΙΩΝ
0 references
Η πράξη περιλαμβάνεται στην εγκεκριμένη Στρατηγική Βιώσιμης Αστικής Ανάπτυξης της πόλης των Τρικάλων και αφορά σε παρεμβάσεις αισθητικής και περιβαλλοντικής αναβάθμισης του αστικού χώρου της πόλης των Τρικάλων. Συγκεκριμένα περιλαμβάνει:1. Παρεμβάσεις επί της οδού Καποδιστρίου με επέκταση των πεζοδρομίων και ενσωμάτωση πάνω σε αυτό του υφιστάμενου ποδηλατόδρομου. Η παρέμβαση, από την πλευρά του ποδηλατόδρομου, έχει συνολικό πλάτος πεζοδρομίου 3,80μ. Στο απέναντι πεζοδρόμιο θα γίνει αντικατάσταση του υλικού επίστρωσης με κυβόλιθους 2. Παρεμβάσεις στην περιοχή του Σιδηροδρομικού Σταθμού με τροποποίηση της υφιστάμενης ισόπεδης διασταύρωσης των οδών Ελευθερίας, Πύλης, Ευρυπίδου και Μετεώρων και διαμόρφωσή της σε κυκλικό κόμβο και αναμόρφωση της εισόδου του Σιδηροδρομικού Σταθμού με τη διαμόρφωση κυκλικού κόμβου στη διασταύρωση των οδών Ασκληπιού, Ευριπίδου και Καβράκου, συμπεριλαμβανομένης της διαμόρφωσης των πεζοδρομίων της ευρύτερης περιοχής. Με ίδιους πόρους του Δήμου Τρικκαίων Π/Υ 59.250,00 Ευρώ, γίνεται αντικατάσταση του υφιστάμενου ασφαλτοτάπητα και κατασκευή των διαβάσεων πεζών επί της οδού Γαριβάλδη, καθώς και αυτών επί των οδών Βύρωνος και Απόλλωνος στη συμβολή τους με την οδό Γαριβάλδη, με κυβόλιθο από γρανίτη χρώματος γκρι και την απαραίτητη σήμανση. (Greek)
0 references
The action is included in the approved Sustainable Urban Development Strategy of the city of Trikala and concerns interventions of aesthetics and environmental upgrading of the urban area of the city of Trikala. In particular, it includes:1. Interventions on Kapodistrian street with extension of the pavements and integration on the existing cycling track. The intervention, on the side of the cycling track, has a total width of 3.80 m. On the opposite sidewalk the coating material will be replaced with blocks 2. Interventions in the area of the Railway Station with modification of the existing level crossing of Eleftherias, Gate, Evripidou and Meteora streets and forming a roundabout and reshaping the entrance of the Railway Station by forming a roundabout at the intersection of Asklipiou, Evripidou and Kavrakos roads, including the formation of the pedestrians of the wider area. With own resources of the Municipality of Trikkaion P/Y EUR 59,250,00, replaces the existing asphalt and construction of pedestrian crossings on the Garibaldi road, as well as those on the streets of Byron and Apollo at their confluence with Garibaldi street, with grey granite cubicle and the necessary marking. (English)
2 July 2021