Q2768736 (Q2768736): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Greece)
(‎Created claim: summary (P836): The project is time for the construction of a new Waste Treatment Plant (EEL) in the Nevrokopi Municipal Unit of the Municipality of Kato Nevrokopi, with a projected capacity of 3,000 inhabitants.The planned projects will ensure integrated urban waste water management, as well as the environmental protection and protection of public health from their uncontrolled disposal, by collecting and transporting wastewater from the settlement of Kato Nev...)
Property / summary
 
The project is time for the construction of a new Waste Treatment Plant (EEL) in the Nevrokopi Municipal Unit of the Municipality of Kato Nevrokopi, with a projected capacity of 3,000 inhabitants.The planned projects will ensure integrated urban waste water management, as well as the environmental protection and protection of public health from their uncontrolled disposal, by collecting and transporting wastewater from the settlement of Kato Nevrokopi to the new EEL. (English)
Property / summary: The project is time for the construction of a new Waste Treatment Plant (EEL) in the Nevrokopi Municipal Unit of the Municipality of Kato Nevrokopi, with a projected capacity of 3,000 inhabitants.The planned projects will ensure integrated urban waste water management, as well as the environmental protection and protection of public health from their uncontrolled disposal, by collecting and transporting wastewater from the settlement of Kato Nevrokopi to the new EEL. (English) / rank
 
Normal rank
Property / summary: The project is time for the construction of a new Waste Treatment Plant (EEL) in the Nevrokopi Municipal Unit of the Municipality of Kato Nevrokopi, with a projected capacity of 3,000 inhabitants.The planned projects will ensure integrated urban waste water management, as well as the environmental protection and protection of public health from their uncontrolled disposal, by collecting and transporting wastewater from the settlement of Kato Nevrokopi to the new EEL. (English) / qualifier
 
point in time: 2 July 2021
Timestamp+2021-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:56, 2 July 2021

Project Q2768736 in Greece
Language Label Description Also known as
English
No label defined
Project Q2768736 in Greece

    Statements

    0 references
    2,202,245.0 Euro
    0 references
    85.0 percent
    0 references
    24 October 2017
    0 references
    31 December 2023
    0 references
    ΔΗΜΟΣ ΚΑΤΩ ΝΕΥΡΟΚΟΠΙΟΥ
    0 references
    0 references

    41°10'1.60"N, 25°1'29.57"E
    0 references

    41°10'1.60"N, 25°1'29.57"E
    0 references
    Το έργο φορά στην κατασκευή νέας Εγκατάστασης Επεξεργασίας Λυμάτων (ΕΕΛ) στην Δημοτική Ενότητα Νευροκοπίου του Δήμου Κάτω Νευροκοπίου, προβλεπόμενης δυναμικότητας 3.000 κατοίκων.Με τα προβλεπόμενα έργα θα εξασφαλιστεί η ολοκληρωμένη διαχείριση αστικών λυμάτων, καθώς και η περιβαλλοντική προστασία και προστασία της δημόσιας υγείας από την ανεξέλεγκτη διάθεσή τους, με την συλλογή και μεταφορά λυμάτων από τον οικισμο του Κάτω Νευροκοπίου στη νέα ΕΕΛ. (Greek)
    0 references
    The project is time for the construction of a new Waste Treatment Plant (EEL) in the Nevrokopi Municipal Unit of the Municipality of Kato Nevrokopi, with a projected capacity of 3,000 inhabitants.The planned projects will ensure integrated urban waste water management, as well as the environmental protection and protection of public health from their uncontrolled disposal, by collecting and transporting wastewater from the settlement of Kato Nevrokopi to the new EEL. (English)
    2 July 2021
    0 references

    Identifiers

    5.003.345
    0 references